| 1 | Annexure-A (LABOUR CHARGES) |
| 2 | Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing. |
| 3 | Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work. |
| 4 | Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in LT line. |
| 5 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual. |
| 6 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. |
| 7 | Erection of PCC single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual. |
| 8 | Dismantling of existing LT line 1P 2W including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light connections etc. including rolling of conductor and cartage back from site to JE store(ACSR Weasel). |
| 9 | Laying of LT service Cable From Pole to consumer end meter alongwith supporting GI wire. |
| 10 | Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70, 120, 150 Sq.mm. (Including all cost of material) |
| 11 | T-off Connection Complete 11 KV line as per Direction of Engineer in Charge. |
| 12 | Laying, Sagging & binding of AB cable of size 120 sqmm.(Only for cable, additional provisions to be made for matching accessories installation,case of any network modification i.e additionalpole etc. and for actual connection, disonnection as per site condition. |
| 13 | Cartage of PCC Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 21- 50 Km) |
| 14 | Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 21-50 Km) |
| 15 | Headload cartage of PCC Pole from road to site (distance 0-1 Km) |
| 16 | Head load cartage of small material (distance 0-1 Km) |
| 17 | Disconnection & Reconnection of Consumer as per Direction of Engineer in Charge. |
| 18 | Installation of LT Distribution Box 3 Phase for LT AB Cable. |
| 19 | Straightening of Tilted STP Poles as per Direction of Engineer in Charge. |
| 20 | Resagging of LT Line as per Direction of Engineer in Charge. |
| 21 | Resagging of LT AB Cable as per Direction of Engineer in Charge. |
| 22 | Straightening of Tilted Single Pole 11 KV Structure as per Direction of Engineer in Charge. |
| 23 | Fixing of MS Clamp as per Direction of Engineer in Charge. |
| 24 | Fixing of Chemical Earthing of T/F as per Direction of Engineer in Charge. |
| 25 | Fixing, tightening and nozzeling of stay with pole and stay set on required tension. |
| 26 | Erection of suitable rating Lugs, Glands, Braided Copper/Strip etc. |
| 27 | Back Carriage of Scrap Material. |
| 28 | Lopping Chopping of Tree Branches near HT/LT Line. |
| 29 | Annexure-B (SUPPLY ITEMS) (As per UPCL Norms) |
| 30 | Supply of Holding Clamp for PCC Pole. |
| 31 | Supply of Suspension Clamp. |
| 32 | Supply of Stay Clamp for PCC Pole. |
| 33 | Supply of Dead End Clamp with I Hook |
| 34 | Supply of insulated Piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 120 Sqmm to 95 Sqmm TYCO/RPG/3M Make. |
| 35 | Supply of SMC Three Phase L.T. Distribution Box with inbuilt panal lock, Al bus bar RYB 25x6mm., Al Busbar N. 40x6mm. for connection of L.T. consumer (Sintex/RMC make or other ISO reputed company) with Panel Lock with key). |
| 36 | Supply of Bolt & Nuts off size. |
| 37 | Supply of LT Bare N. connector PG Clamp for L-L 95-95 Sq.MM |
| 38 | Supply of insulated Piercing connector body molded from high quality mechanical climate and UV resistant glass reinforced polyamide, hot dipped galvanized bolts & contact teeth ABC size 120 Sqmm to 35 Sqmm TYCO/RPG/3M Make. |
| 39 | Supply of MS Clamp 65x6 mm with N&B. |
| 40 | Supply of M-Seal Compound. |
| 41 | Supply of Al. Crimping Type Lugs 120 Sq.MM |
| 42 | Supply of Al. Crimping Type Lugs 70 Sq.MM |
| 43 | Supply of Aluminium Lug 25 Sq.MM |
| 44 | Suppply of MS half Clamp for LT Distribution Box. |
| 45 | Supply of Ace Chemrod DIA60MM length 3000MM. |
| 46 | Supply of Fluid Compound for Chemical Earthing Rod. Please Enable Macros to View BoQ information |