|
| 1 | Servicing of following capacity Split / window type AC/Cassate AC and water cooler of different makes installed at various locations including cleaning with vemi clean, washing with high pressure water spray electric machine, coil cleaning and D Scaling Chemical, drying with air blower, oiling, greasing, of blower fans i/c replacement of filter complete with testing, commissioning etc. as required.a) Window type AC unit/Split type AC/Cassate AC of 1.5 TR / 2.0 TR capacity |
| 2 | Comprehensive running maintenance and servicing of WTAC/STAC (1.0/1.5/2.0) TR)/ Water Coolers of different makes and models installed at various places including labour change and replacement of all defective minor parts, i/c supplying and charging of R-410A/R-22 refrigerant gas in the compressor in case of leakage (Except replacement of compressor) i/c checking the units chemical cleaning of condenser coil, cooling coil i/c replacement of defective parts, Air Filter, running capacitor, starting capacitor, starting relay, thermostat switch, wiring kit, 15/20 Amp Plug top/Industrial socket, flexible wire and tightening the loose connection, complete as required. 138 x 8 month = 1104 unit for 8 months |
| 3 | Supply & Replacement of following capacity type new compressor in the existing STAC/WTAC& Water Cooler i/c buy back of credit dismantle material testing & commissioning etc. complete as reqd. |
| 4 | 1.0 Ton Compressor for water cooler |
| 5 | 1.5 Ton Compressor |
| 6 | 2.0 Ton Compressor |
| 7 | Supply and Gas charging in the existing Air Conditioners of 1.50 ton/2.0 Ton capacity in the existing AC i/c leakage testing and repair commissioning etc. complete as reqd. |
| 8 | Supply & Replacement of Cooling coil of 1.50 ton/2.0 Ton capacity in the existing STAC/WTAC i/c buy back of dismantle material testing & commissioning etc. complete as reqd. (As per Existing Make) |
| 9 | Repairing of defective inverter type PCB 1.5/2.0 TR capacity STAC testing & commissioning etc. complete as reqd. |
| 10 | Supplying and installation of 1/2\\" and 1/4\\" copper pipe with insulation and copper cable insulation & drain pipe i/c brazing, testing, commissioning etc. as reqd. |
| 11 | Shifting of 2.0 /1.5 TR Air Conditioner unit of split AC with all accessories form one place to another place i/c all interconnection etc. complete as required. |
| 12 | Supplying and fixing of drain pipe in the existing A.C i/c testing, commissioning etc. as reqd. |
| 13 | Comprehensive Maintenance of R.O Systems |
| 14 | Annual Comprehensive maintenance of Various makes (Eureka Forbes/Ion Exchange/Kent) from 15 LPH to 50 LPH R.O. System installed at various location including replacement of all spare parts including power supply, all consumables filter (Particulate filter, Sediment filter, Precarbon filter, Postcarbon filter), Booster Pump, D-watering Pump adaptor, water level controller with 2 meter water proof cable, Solenoid Valve, LPS and all other Accessories Except Membran required for smooth functioning of R.O. System Total Qty. of R.O. in this scope of work:-18 Job |
| 15 | S.I.T.C of 20\\" size prefilters with housing cabinet in the existing pipe line of existing R.O System etc. complete as reqd. |
| 16 | Supply & fixing of Membrane 300 GPD with housing in the existing 50 LPH R.O System i/c testing commissioning etc. as required. |
| 17 | Supply & fixing of RO High Pressure Switch in the existing 15/50/150 LPH RO System i/c testing commissioning etc. as required. Please Enable Macros to View BoQ information |