| 1 | Servicing, Repairing and Maintenance of 15 Nos. 1.5 ton toshiba inverter Air conditioners installed at different location of kakri Mine |
| 2 | Man power for complete servicing, washing, greasing and oiling etc. of air conditioners installed at various locations ( Servicing to be done minimum two times during the season) |
| 3 | supply of PCB for IDU |
| 4 | supply of PCB for ODU |
| 5 | supply of Thermostat |
| 6 | supply of Condenser 60+5 µF, 440 V |
| 7 | supply of Blower Suitable for 1.5 Ton AC |
| 8 | supply of Fan Blade 1.5 Ton AC |
| 9 | supply of Non Return valve |
| 10 | After fitting of the above spares and compressor, leakage test with Nitrogen at all joints, Vaccum the whole AC system upto 30 psi pressure and gas charging with refrigerant R410 |
| 11 | supply of Gas charging of A/C with Required pip, fitting etc. |
| 12 | Rewinding of fan motor, changing of bush, bearing, capacitors |
| 13 | supply of relay for A/C |
| 14 | supply of selector switch |
| 15 | supply of bush, screw of required size for A/C |
| 16 | supply of AC remote panel assly. With remote (Blue star, Videocon or equivalent) |
| 17 | Estimate for Servicing, Repairing and Maintenance of 21 Nos. different make Air conditioners installed at different location of kakri mine |
| 18 | Man power for complete servicing, washing, greasing and oiling etc. of air conditioners installed at various locations for 365 days |
| 19 | supply of Gas charging with materials |
| 20 | supply of capillary pipe |
| 21 | Fan motor re-winding |
| 22 | supply of motor shaft |
| 23 | supply of shaft bush |
| 24 | supply of rotary compressor 1.5 ton |
| 25 | supply of cooling fan for 1.5 Ton AC |
| 26 | supply of thermostats for 1.5 ton AC |
| 27 | supply of Blades for 1.5 ton AC |
| 28 | supply running capacitor |
| 29 | supply of overload relay |
| 30 | supply of starting relay |
| 31 | supply of starting capacitor |
| 32 | supply of selector switch |
| 33 | supply of air filter |
| 34 | supply of PCB Circuit Board |
| 35 | supply of refrigeration copper pipe for AC |
| 36 | Servicing, Repairing and Maintenance of 10 Nos Water cooler installed at different location of mine |
| 37 | Man power for complete servicing, washing, greasing, oiling and painting of bottom surface of water cooler ( Servicing to be done two times during the season) |
| 38 | supply of gas charging with materials |
| 39 | Rewinding of fan motor |
| 40 | Denting & painting of water cooler |
| 41 | supply of compressor make-rotary |
| 42 | supply of thermostats |
| 43 | supply of overload safety |
| 44 | supply of running capacitor |
| 45 | supply of cooling & condensing unit |
| 46 | supply of starting capacitor |
| 47 | supply of float valve |
| 48 | supply of water cut-off sensor |
| 49 | supply of starting relay |
| 50 | supply of fan blades of water cooler |
| 51 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |