|
| 1 | Erection of HT Line |
| 2 | Prov.Steel Tubular pole 9 mtr. Long |
| 3 | Prov.RCC Muff with concerete feeling |
| 4 | Prov. C.I.X-arm (1500x100x50x5)x2 mm for single pole str. |
| 5 | Prov. A.I. X-Bracing Set (750x50x50x6)x2mmx2 for guarding |
| 6 | Prov. A.I. X-Arm (1800x50x50x6)mm for guarding of GI wire |
| 7 | Prov. Pin Insulator with pin hellically formed fitting CD-320mm |
| 8 | Prov. H.T.Stay set Complete |
| 9 | Prov. Stay wire 7/3.15 mm (@ 8.0 kg Per Stay set ) |
| 10 | Prov. Half Clamp for cross arms |
| 11 | Prov. Full Clamp for Stay set |
| 12 | Prov. Nut & Bolt (off sizes ) |
| 13 | Aluminum Paint |
| 14 | Danger Plate ( 203x200x1.6mm) |
| 15 | Prov. AAAC 7/3.15 mm (50 mm2 ) |
| 16 | Prov. G.I wire 8 SWG |
| 17 | Prov. Earth Hook HT 8\\" Long |
| 18 | Prov. Egg insulator HT |
| 19 | Add Dismantling of AAAC 7/3.15 mm sq. i.e. removal of conductor from insulator, De-Stringing for 0.120x3=0.330 kM charges. |
| 20 | Add Re-Erection charges of AAAC 7/3.15 mm sq. i.e. Laying, Stringing and sagging, Binding with insulator for 0.135x3=0.405 kM |
| 21 | Add Erection charges of G.I Wire 8 SWG for 0.135x2=0.270 kM |
| 22 | Erection Charges of ST Pole 9 mtr long |
| 23 | Erection Charges of HT Stay Set |
| 24 | Add Transportation Charges |
| 25 | Prov.Steel Tubular pole 11 mtr. Long |
| 26 | Prov.RCC Muff with concerete feeling |
| 27 | Prov. C.I.X-arm (1500x100x50x5)x2 mm for single pole str. |
| 28 | Prov. A.I. X-Bracing Set (750x50x50x6)x2mmx2 for guarding |
| 29 | Prov. A.I. X-Arm (1800x50x50x6)mm for guarding of GI wire |
| 30 | Prov. Pin Insulator with pin hellically formed fitting CD-320mm |
| 31 | Prov. H.T.Stay set Complete |
| 32 | Prov. Stay wire 7/3.15 mm (@ 8.0 kg Per Stay set ) |
| 33 | Prov. Half Clamp for cross arms |
| 34 | Prov. Full Clamp for Stay set |
| 35 | Prov. Nut & Bolt (off sizes ) |
| 36 | Aluminum Paint |
| 37 | Danger Plate ( 203x200x1.6mm) |
| 38 | Prov. AAAC 7/3.15 mm (50 mm2 ) |
| 39 | Prov. G.I wire 8 SWG |
| 40 | Prov. Earth Hook HT 8\\" Long |
| 41 | Prov. Egg insulator HT |
| 42 | Prov. Shackle Insulator with D-Iron |
| 43 | Add Dismantling charges of AAAC 7/3.15 mm sq. i.e. removal of conductor from insulator, De-Stringing for 0.770 km (HT = 0.110x3=0.330 kM + LT = 0.110x4=0.440) |
| 44 | Add Re-Erection charges of AAAC 7/3.15 mm sq. i.e. Laying, Stringing and sagging, Binding with insulator for 0.805 km (HT = 0.115x3=0.345 kM + LT = 0.115x4=0.460) |
| 45 | Add Erection charges of G.I Wire 8 SWG for 0.115x2=0.230 kM |
| 46 | Erection Charges of ST Pole 11 mtr long |
| 47 | Erection Charges of HT Stay Set |
| 48 | Add Transportation Charges Please Enable Macros to View BoQ information |