| 1 | Erection Part |
| 2 | Erection of Tilted Steel Tubular pole Single Structure 9/10/11 Mtr Long:- Digging of Pit,Drilling of Holes In X-Bracing Set, X-Arm, Erection of Pole, Concreting of Muff,Fixing of Insulater X-Arm, X- Bracing Set , Fixing of Barbed Wire Danger Plate, Filling of Pit+ Ramming,Paniting of Pole compete in all respects |
| 3 | Erection of Steel Tubular pole Single Structure 9/10/11 Mtr Long:- Digging of Pit,Drilling of Holes In X-Bracing Set, X-Arm, Erection of Pole, Concreting of Muff,Fixing of Insulater X-Arm, X- Bracing Set , Fixing of Barbed Wire Danger Plate, Filling of Pit+ Ramming,Paniting of Pole compete in all respects |
| 4 | Re-Erection Charges Of ACSR/AAAC 50MM2:-1KM SINGLE ACSR/AAAC 50MM2 .D-Stringing of Conductor ,Re-Stringing & Re-Sagging,Binding Complete in all respect |
| 5 | Erection Charges Of Stay Set:-Fixing Of Stay Rod,Filling Of Pit,Nozzeling & Tighting complete in all respect |
| 6 | Manual Carriage Of Material For HT Line Considering Average Distance From Road To Site Of Work (Avr.Lead =1.500)i.e Total Span =0.500*1.500=0.750)km |
| 7 | Supply Part |
| 8 | Muffs (2000mm) with concerete filling |
| 9 | X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length:2800mm x 2 No.] i/c tolerance of 100 mm either side) |
| 10 | Stay set complete in all respect (i/c Stay Clamp) (1No. / Single Pole , 4 No. / Double Pole Structures) |
| 11 | Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) |
| 12 | Half clamps: [On Double Pole Dead End structure: 4 No |
| 13 | Full clamps: [On Double Pole Dead End structure: 4 No |
| 14 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 15 | Aluminium Paint Please Enable Macros to View BoQ information |