| 1 | Erection of DTR and LT Line |
| 2 | 11/0.4 KV 63 kVA Distribution Transformer |
| 3 | G.O.Switch 400 Amp. |
| 4 | D.O.Fuse unit |
| 5 | Lightning Arrestors 9 kV 5 kA Porcelain type |
| 6 | LT Distribution Panel Box with MCCB 100 Amp. For 63 kVA DTR |
| 7 | Pipe Earthing |
| 8 | M.S. Nuts and Bolts (Off Sizes) |
| 9 | A. Thimble |
| 10 | Cu Thimble 95 mm2 |
| 11 | Danger Plate |
| 12 | Barbed Wire |
| 13 | LT Cable 3.5x120 mm2 |
| 14 | LT Cable 3.5x70 mm2 |
| 15 | AAAC 7/3.15 mm 50mm2 conductor for earthing, connections. |
| 16 | Prov. Energy meter LT 3-Phase 4 wire (100/5A) |
| 17 | Civil work i.e Chain Link Fencing, Angle Iron, Gate etc. of Transformer fencing |
| 18 | Add Erection Charges i.e. Erection of Transformer, LT Panel, Energy Meter, Erection of LT Cable & Dismantling of old Transformer and carriage to the Divisional Store |
| 19 | Add Transportation Charges |
| 20 | Steel Tubular Pole 8 Mtr. Long |
| 21 | RCC Muff |
| 22 | Prov. Shackle insulator with D-Iron |
| 23 | Prov. Egg Insulator |
| 24 | Prov. Eye Hook Bolt |
| 25 | LT Earthing Complete |
| 26 | LT Stay Set Complete |
| 27 | Stay Wire 7/3.15mm @ 6.0Kg.Per Stay Set |
| 28 | Prov. G.I wire 8 SWG |
| 29 | Prov. AAAC 7/3.15 mm (55mm2) |
| 30 | Prov. Energy Meter LTAC Three Phase kWH meter (10-60 A) |
| 31 | Prov. LT cable 3.5C 35 mm2 Havells MR with 30% discount |
| 32 | Prov. Full Clamp |
| 33 | M.S Nuts & Bolts (off sizes) |
| 34 | Prov. Aluminium Paint |
| 35 | Add Dismantling charges of off size conductor i.e de-string removal of conductor from insulator and rolling of conductor for 0.190x4=0.760 km + 0.570x2=1.140 kmtr |
| 36 | Add Erection charges of AAAC 7/3.15 mm sq i.e string & sagging, binding with insulator for 0.910x4=3.640 km |
| 37 | Add Erection charges of ST Pole 8 Mtr. Long |
| 38 | Add Erection charges of LT Stay Set |
| 39 | Add Erection charges of Earthing Set |
| 40 | Add Erection charges of G.I wire 8 SWG for 0.910 km |
| 41 | Add Erection charges of LT cable 0.070 mtr |
| 42 | Add Transportation Charges |
| 43 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 44 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) |
| 45 | Centering and shuttering including strutting, propping etc and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 46 | Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge. |
| 47 | Brick work with common burnt clay machine moulded perforated bricks of class designation 12.5 conforming to IS: 2222 in superstructure above plinth level up to floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) : With Modular bricks |
| 48 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand). |
| 49 | 15 mm cement plaster on the rough side of single or half brick wall of mix 1:6 (1 cement: 6 fine sand). |
| 50 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two or more coats on new work |
| 51 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 52 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work Please Enable Macros to View BoQ information |