| 1 | Material Part of 250 KVA S/Stn (TS No. 117/2025-26) |
| 2 | Prov. Muff with concerete filling |
| 3 | Prov. X-arm [ Chhanel iron (100x50x5mm), Length:2800 mm X 2 Nos] |
| 4 | Prov. M S Angle Iron.(50x50x6mm) Length 2800 mmx(1 No) For LA |
| 5 | Prov. X-arm [ Chhanel iron (75x40x4.8mm), Length:2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 6 | Prov. X-arm [ Chhanel iron (100x50x5mm), Length:2800 mm X 2 Nos] |
| 7 | Prov. X-arm [ Chhanel iron (100x50x6mm), Length:460 mm X 2 Nos for supporting Main Channel of Transformer] |
| 8 | Prov. M S Angle Iron (50x50x6mm) Length 2800 mm x 2 Nos |
| 9 | Prov. M S Angle Iron (35x35x6mm)Length 460mm x 2 Nos |
| 10 | Prov. M S Angle Iron (50x50x6mm) Length 950 mm x 2 Nos |
| 11 | Prov. M S Angle Iron (50x50x6mm) Length 2800 mm x 2 Nos |
| 12 | Prov. M S Angle Iron (50x50x6mm) Length 450 mm x 1Nos |
| 13 | Prov. GO switch handle supporing M S Channel Iron (75x40x4.8mm) Length 460 mm x 1Nos |
| 14 | Prov. GO AB Switch Unit (11 KV. 400A. 25 KA ) |
| 15 | Prov. D.O fuse Unit. |
| 16 | Prov Dead End Clamps, straight stepples, Bend stapples and eye socket, ball cleave etc. |
| 17 | Prov. Stay set comp. |
| 18 | Prov. Stay wire(7/3.15mm)(7.0 Kg per stay set). |
| 19 | Prov. Pipe Earthing set . |
| 20 | Prov. Half clamp (M.S. Flat 50x6mm) |
| 21 | Prov. Full clamp (M.S. Flat 50x6mm) |
| 22 | Prov. M.S. Nuts & Bolts of various sizes (Galvanised/Coated) [Preferably 16 mm phase or more (with flat and spring washers)] |
| 23 | Prov. copper Thimble |
| 24 | Prov. Danger plate |
| 25 | Prov. Barbed Wire |
| 26 | Prov. Aluminium Paint |
| 27 | Prov. Red oxide |
| 28 | Prov. LT Switched Capacitors 81-KVAR for 250 KVA (Rate per KVAR) |
| 29 | Prov. Chain Link Fencing, Angle Iron, Gate etc. for transformer fencing |
| 30 | Prov. Transformer Bed (Civil work) |
| 31 | Material Part of HT (TS No. 118/2025-26) |
| 32 | Prov Dead End Clamps, straight stepples, Bend stapples and eye socket, ball cleave etc. |
| 33 | Prov. 11 KV pin insulator with pin |
| 34 | Prov.Stay set complete in all respect (i/c Stay Clamp) |
| 35 | Prov. Stay wire(7/3.15mm)(10 Kg per stay set). |
| 36 | Prov. Half Clamps |
| 37 | Prov.Full Clamps |
| 38 | Material Part of LT (TS No. 119/2025-26) |
| 39 | Prov. RCC Muff with concerete filling |
| 40 | MS chanel iron (75x75x6mm) length 1500 |
| 41 | Shackle insulator |
| 42 | D-iron |
| 43 | Prov. L.T. Stay set Complete |
| 44 | Prov. Stay wire (7/3.15mm)(6.0Kg per stay) |
| 45 | Half clamp |
| 46 | Full clamp |
| 47 | Prov. Nut & Bolts of various sizes (Galvanised / Coated ) [Preferable 16 mm Ø or more (With flat and spring washers )] |
| 48 | Prov. Red oxide |
| 49 | Prov. Aluminium Paint |
| 50 | LT Earthing set (preferbly coil earthing) |
| 51 | Erection Part of 250 Kva S/Stn (TS No. 117/2025-26) |
| 52 | Erection of 250 KVA 11/0.4 KV Transformer, erection of T Pole, Painting of Pole, erection of stay, transformer earthing, LT Penal Box, Energy meter, LT Cable including loading and unloading Transformer complete in all respect |
| 53 | Manual carriage for above material (Av. Lead 0.050 Km.) |
| 54 | Erection Part of HT (TS No. 118/2025-26) |
| 55 | Erection of HT stay set, stay wire, stay clamp, egg insulator, digging of pit, filling and ramming, fixing of stay rod, nozzeling and tightening etc. complete in all respect. |
| 56 | Erection AAAC 7/3.15 (50mm2) i/c laying, stringing, sagging, binding with insulators and jumpering etc. complete in all respect. |
| 57 | Erection Part of LT (TS No. 118/2025-26) |
| 58 | Erection of LT steel poles 8/9 Mtrs long, shackle insulator with D-iron eye hook, digging of pole pit size 1.20x0.80x1.35 filling and ramming and painting etc complete in all respect |
| 59 | Erection of LT stay set, stay clamp, egg insulator, stay wire, stay thimble, nozzeling and tightening, digging of stay pit size 1.20*.80*.1.50 mtr, filling and ramming of pit complete in all respect |
| 60 | Erection of LT earthing (pipe earthing) set complete in all respect, digging of earth pit, filling of pit with required material and ramming complete in all respect. |
| 61 | Erection AAAC 6/1/3.35 (50mm2) i/c laying, stringing, sagging, binding with insulators and jumpering etc. complete in all respect. (Single Conductor P/kM) |
| 62 | Manual carriage for above material (Av. Lead 0.100 Km.) Please Enable Macros to View BoQ information |