| 1 | Subwork No. 1: 11 KV 3 C 185 mm 2 XLPE under ground Cable. |
| 2 | XLPE Cable 11 KV 3C/185 sq.mmProviding, errecting, testing and commissioning LT XLPE Armoured Cable of 3 core & 185 Sqmm etc complete. |
| 3 | RCC Pipe 150mm 2MProvide and fixing Half Round Cement Pipe. |
| 4 | Half round Cement pipeProvide and fixing Half Round Cement Pipe. |
| 5 | 11 KV Heat Shrinkable Straight through jointing Kit For 3C *185 sqmm Providing and fixing 11 KV Heat Shrinkable straight Through Jointing Kit suitable For 3Core x 185 Sqmm XLPE cable. |
| 6 | 11 KV Heat Shrinkable Outdoor Termination Kit For 3C *185 Sqmm Providing and fixing 11 KV Heat Shrinkable Outdoor Termination Kit suitable For 3Core x 185 Sqmm XLPE cable. |
| 7 | SandProviding sand cushioning for underground cable. |
| 8 | Misc for XLPE U/G cableProviding all miscellaneous materials required for XLPE underground cable work. |
| 9 | Subwork No. 2: 11 KV FEEDER BAY WITH GANTRY STRUCTURE & PT 2.1L.As. 11 KV (Gapless Type ) With Disconector |
| 10 | 33 KV Isolators with EB (800 A) |
| 11 | 33 KV Isolators without EB (800 Amp.) |
| 12 | 11 KV VCB 400 A Outdoor |
| 13 | 11 KV CT 400-200/5-5 Outdoor |
| 14 | C $ R Panel For 11 KV Outgoing Feeder OD |
| 15 | 11 KV Feeder bay (Structure, Foundation, Bus barmaterial, Cable, Earthing Materials & Painting ) 2.71 .STRUCTURE 2.71.1 Structure for 11 KV L.A |
| 16 | Structure for 11 KV CT |
| 17 | G.I Gantry Structure |
| 18 | G.I Nut Bolts |
| 19 | Welding Rods |
| 20 | Foundation Civil Work2.72.1 Foundation for 11 KV Isolator |
| 21 | Foundation for 11 KV Isolator without EB |
| 22 | Foundation for 11 KV Ligthing Arrestor |
| 23 | Foundation for 11 KV C. Ts |
| 24 | Foundation for 11 KV Breaker |
| 25 | Foundation for Gantry Structures |
| 26 | BUS-BAR MATERIAL2.73.1 AAAC 232 mm2 |
| 27 | T-Connector For 200 sq mm conductor (Compression type) |
| 28 | Breaker Clamps |
| 29 | Clamps For Isolator |
| 30 | Clamps For CTs |
| 31 | Disc Insulators 11 KV 70 KN |
| 32 | Strain Hardware for AAAC 232 sq. mm |
| 33 | CONTROL CABLE2.74.1 a Armoured Copper control cable 19C X 2.5 Sq mm |
| 34 | Armoured Copper control cable 2Cx2.5 sq.mm. |
| 35 | Armoured Copper control cable 2C X 4 Sq mm |
| 36 | Cable Trays 2.5 Mtr. X 6\\" W |
| 37 | Cable Glands, rerules and tape. Etc. |
| 38 | Angle for fixing trays 50x50x6mm |
| 39 | Half round cement pipe (150mm X 1mtr) |
| 40 | EARTHING WORK2.75.1 M.S Flat (50X10) mm |
| 41 | M.S Flat (25X6) mm |
| 42 | Earthing Set H.T of C.I Pipe 150mm m Mtr |
| 43 | Welding Rods |
| 44 | Hiring of Welding Machine |
| 45 | Brick & Masonary Work For Earthing Pit |
| 46 | PAINTING OF STRUCTURES2.76.1 Red Oxide Paint for 2 coats |
| 47 | Alluminium Paint For 1 coat |
| 48 | Marshalling Box |
| 49 | All other relevenat items required for completion of this subwork |
| 50 | Subwork No. 3: DOUBLE POLE STRUCTURE (Cut Point) OF- 11KV LINE USING 11M LONG RSJ POLE3.1 RSJ 116X100, 11 m longProviding, errecting, testing and commissioning Rolled steel joint ( Girder) pole 100 x 116 mm ( Wt. 23 Kg/Mtr.)and 11 mtr. long complete erected in provided CC foundation & muffing square or round etc complete. |
| 51 | RSJ 116X100, 10m long For stud |
| 52 | M.S Flats (50X10mm)MS work for flats(50x6)mm with painting, 2 coats of red oxide & 1 coat of Aluminium Paint |
| 53 | MS Channel 100 x50x6 mmMS work for channel (100x50x6)mm with painting, 2 coats of red oxide & 1 coat of Aluminium Paint |
| 54 | MS Channel 75x40x6 mmProviding & erecting bracket for guarding, made from channel iron 1600mm in length & 75x40x6mm erected on pole etc complete.( wt of channel 7.14kg/mt) |
| 55 | MS angle 50x50x6 mmMS work for angles(50x50x6)mm with painting, 2 coats of red oxide & 1 coat of Aluminium Paint |
| 56 | Strain Hardware For Dogo 0.1 or Equ AAAC. |
| 57 | Disc Insulator 11KV 70 KNProviding, errecting, testing and commissioningporecelain disc type insulator suitable for 11 KV H.T. line with hardware fitting etc complete. |
| 58 | 11 KV Pin Insulator with GI PinsProviding, errecting, testing and commissioningporecelain pin type insulator with G.I. pins suitable for 11 KV H.T. line with hardware fitting etc complete . |
| 59 | H.T Stay Set |
| 60 | G.I Stay Wire 7/4mm (8 SWG)Providing, errecting, testing and commissioning H.T. Stay set for poles with G. I. stay wire 7/8 SWG etc |
| 61 | Earthing Sets H.TProviding, errecting, testing and commissioningPipe/Rod type earthing etc complete. |
| 62 | G.I Wire 8 SWG/6 SWGSupplying and erecting G. I. Earth Wire of high purity of different sizes used for earthing or any other purposes on wall with necessary G. I. Clamps fixed on wall/cable/ conduit with screws in an approved manner. |
| 63 | G.I Barbed Wire 'A' typeProviding, errecting, testing and commissioningBarbured wire two ply with 12SWG ply &12 SWG barb for anticlimbing devices etc complete. |
| 64 | Danger Board in yard.Providing, errecting, testing and commissioningEnamelled iron G. I. Danger Board etc complete. |
| 65 | Black Bituminus Paint |
| 66 | Red Oxide Paint for 2 coats |
| 67 | Aluminium Paint for 1 coat |
| 68 | G.I Nut Bolt |
| 69 | Concreting ration 1:3:6 |
| 70 | SundriesProviding, errecting, testing and commissioning Sundry Material as required of the time of execution work etc complete. |
| 71 | 11 KV A B Switch 400 AProviding, errecting, testing and commissioning 11kVA.B. Switch 400 Amp with 3 post pin type insulator per phase, mounted in horizontal or vertical position with necessary channels on rovided cross arm with adequate length of \\"C\\" class G.I. pipe for operating handle erectedon extended square shaft. The operating handleprovided with lock and key at suitable height fromground level with necessary clamp.etc complete. |
| 72 | H.D.P.E Pipe 150mm Withspaces |
| 73 | 11 KV Lighting Arrestor ( Station type ) |
| 74 | Subwork No. 4: SINGLE CIRCUIT PIN TYPE WITH 55 SQ.MM AAAC LINE OM 100X116 MM 11 MTR RSJ 4.1 11 KV Guarding channel MS 75x40x6 |
| 75 | M.S Flats (50X10mm) |
| 76 | AAAC 55 mm2 |
| 77 | SundriesProviding, errecting, testing and commissioning SundryMaterial as required of the time of execution work etc complete. |
| 78 | Subwork No. 5: HDD Bore For Road Crossing Cable Laying work. 5.1Providing, Laying and Jointing of suitable dia HDPE pipe (PN 6 Class-PE 80 grade: IS 14333) to correct grade and alignment above 5m upto 8m depth including boring. Pilot inclined drilling from existing ground level upto required depth (invert level) on rig side of proposed HT cable (i.e. entry side) and Final inclined boring from R3-SE-exisitng ground level upto required depth (invert level) or vice versa on pipe side (i.e. exit side) of proposed HT cable using Horizontal Directional Drilling method in any type of ground including soft soil, mixed ground and soft/hard rock. |
| 79 | Subwork No. 6: SERVICE CONNECTION MATERIAL CHARGES6.1 11 KV Metering cubicle of CT ratio 25/5 Amp, Accuracy class-0.5s Burden- 10 VA Single Core, Single Ratio & PTR 11000V /…Class 0.5,/ Burden 50 VA |
| 80 | XLPE Cable 11KV, 3C/ 185 mm. sqSupply and laying of 11 KV XLPE Cable, 3 Core x 185sq.mm. |
| 81 | 11 KV Cable Jointing Kit Outdoor Type |
| 82 | 12 KV Cable Jointing Kit Indoor Type |
| 83 | Copper Earting Of metering cubicle |
| 84 | RCC half round pipe (1mtr)Provide and fixing Half Round Cement Pipe |
| 85 | GI pipe 6\\" diameter |
| 86 | Foundation for metering cubicle |
| 87 | Concreting work for cable trench |
| 88 | Sundries |
| 89 | Subwork No. 7: Erection cost for subwork 1 to 67.1 Erection, testing etc. complete work of for subwork 1 to 6 including all labour as per specification and directed by engineer in charge. |
| 90 | Subwork No. 8: TRANSFORMER 11 KV/0.433V,160 KVA8.1 Supplying, installing, testing & commissioning of 3 phase, 11/0.433 kV, 50 Hz.,160 kVA, Mineral oil immersed and naturally cooled outdoor type, ONAN, copper wound Non-sealed transformer, delta/star connected with additional neutral brought out on load side, temperature rise should not exceed 40℃ by thermometer in oil and 45℃ by the resistance method in winding at full load rating, using type A winding insulation (kraft paper) , with standard accessoriescomplete with test certificate with losses below 475 Watts at 50% load, 1650 Watts at 100% load as per IS:1180 (part 1) : 2014, and Included RSJ Ploe, isolator switch, Lighting arrestor, DO fuse, AB swich and transformer foundation and necessary earthing of transformer. necessary permissions of ElectricalInspector, as per specification no SS- TR-NSL. Please Enable Macros to View BoQ information |