| 1 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the University Engineer and clearing and levelling the site, etc., complete as per standard specifications and as directed by the University Engineer. |
| 2 | Supplying and filling in Dispersion trench/Soak pit with filling 40mm brick jelly in layers of not more than 15 cm thick well rammed and compacted etc. complete complying with standard specification and as directed by the University Engineer. |
| 3 | Supplying and filling in Dispersion trench/Soak pit with Stone lime in layers of not more than 15 cm thick well rammed and compacted etc. complete complying with standard specification and as directed by the University Engineer. |
| 4 | Supplying and filling in Dispersion trench/Soak pit with filling 40mm coarse aggregate in layers of not more than 15 cm thick well rammed and consolidated etc. complete complying with standard specification and as directed by the University Engineer. |
| 5 | Supplying and fixing in position best quality PVC soil/waste pipes of various dia having 6 kg/ sq.cm. pressure BIS mark and providing leak proof joints using PVC adhesives including fixing to the wall with special PVC/MS clamp, teak wood plugs, brass screws, etc., and making connection to all sanitary fittings, dismantling masonry/RCC works wherever found necessary and making the good dismantled portion to the original condition, including testing for any leakages, etc., complete complying with standard specifications. (The PVC pipes should be got approved by the University Engineer before use on works). The rate for earth work excavation will be measured and paid separately in the cases where the pipe lines are proposed to laid below ground level. |
| 6 | a) For 160mm dia pipe |
| 7 | a) For 110mm dia pipe |
| 8 | Supplying and fixing in position PVC specials of the following dia and types of approved quality confirming to BIS and providing leak proof joints including fixing to the walls and giving connection to the PVC soil stacks, dismantling the masonry or RCC works and re-doing the dismantled portion to original condition etc., complete complying with standard specifications. (The PVC specials should be got approved by the University Engineer before use on works). |
| 9 | a) PVC Elbow (160mm dia) |
| 10 | b) PVC TEE (160mm dia) |
| 11 | Cement Concrete 1:5:10 (one cement, five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification and as directed by the University Engineer.. |
| 12 | Brick Work in cement mortar 1:5 (one cement and five sand) using Fly ash Bricks of size 230x110x70mm for the following items,including neat finishing, curing etc., complete complying with standard specifications. (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost) |
| 13 | a) For foundation and basement |
| 14 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 50mm thickness in RCC 1:2:4 (one cement, two crushed stone sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the University Engineer. |
| 15 | Supplying, fabricating and placing in position Mild Steel/Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) |
| 16 | Plastering the surface of walls with Cement Mortar 1:3 (one cement and three crushed stone sand), 12mm thick in all floors including curing etc., complete complying with standard specification and as directed by the University Engineer. |
| 17 | GST @ 18% Please Enable Macros to View BoQ information |