| 1 | Earth work excavation and depositing on sides with initial lead and lift in hard stiff clay, hard red earth and hard gravelly soil as per SS20B for foundation |
| 2 | Supplying and filling in foundation and basement with filling sand in layers not more than 15cm thick well rammed, watered and compacted complete complying with standard specification |
| 3 | Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification |
| 4 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing |
| 5 | Plain Cement concrete 1:3:6 mix using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification |
| 6 | Plain Cement concrete 1:2:4 mix using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification |
| 7 | Providing and fixing Bitumen pad |
| 8 | Plastering with CM 1:5, 12mm thick inluding cost and conveyance of all materials to site and all labour charges etc., |
| 9 | Earth work excavation and depositing on sides with initial lead and lift in hard stiff clay, hard red earth and hard gravelly soil as per SS20B for foundation |
| 10 | Supplying and filling in foundation and basement with filling sand including cost and conveyance of all materials to site and all labour charges etc., complete |
| 11 | Plain cement concrete in 1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc., complete |
| 12 | Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications Footing |
| 13 | Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications Deck slab |
| 14 | Plain cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. |
| 15 | P.C.C.1:2:4 mix using 20mm ISS HBG metal including cost and conveyance etc., |
| 16 | Supplying and fabrication of steel including cost and labour charges etc., complete. |
| 17 | R.C.C.1:1½:3 mix using 20mm ISS HBG metal including cost and Labours etc., complete. |
| 18 | Providing and fixing tar paper for bearing bed black &deck slab |
| 19 | Providing and fixing 20mm thick compressible fibre boar Expansion Joint complete |
| 20 | Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, |
| 21 | Provision for Name board |
| 22 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |