|
| 1 | Construction of 100000 Litre Capacity Sump & Extension of PVC Pumping Pipe line at Vagaikulam villge in Manthiyoor Panchayat ,Kadayam Panchayat Union Under 15th CFC - 2025 - 26 & Village Panchayat General Fund - 2025 - 2026 |
| 2 | Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m. and as directed by TWAD BOARD Officers. |
| 3 | First depth of 0 to 2 m |
| 4 | Filling with clean M.sand complying with standard specification including watering ramming and consolidation etc., complete and as directed by TWAD BOARD Officers. |
| 5 | Levelling coarse in cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials,mixing,placing, ramming, curing,finishing etc., complete and as directed by TWAD BOARD Officers. |
| 6 | Reinforced Cement Concrete with M30 Design Mix for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing position, lifting, vibrating, finishing curing,finishing etc., complete and as directed by TWAD BOARD Officers. |
| 7 | Beyond 1.50 m & upto 4.50 m below GL |
| 8 | Upto 1.50 m Below GL |
| 9 | Upto 4.50 m above GL |
| 10 | Supply and erection of steel centering,shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10stiffened with MS angle of size 25 X 25 X 3mm for boarding laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm - 13cm spaced at 75cm c/c etc., complete and as directed by TWAD Board Officers. |
| 11 | For 0.00 to 3.30 M (Plane Surface) |
| 12 | For 0.00 to 3.30 M (Curved Surface) |
| 13 | For 0.00 to 3.30 M (FOR ROUND COLUMN) |
| 14 | For 3.30 M- 4.3 M (Plane Surface) |
| 15 | For 3.30 M TO 4.30M (Curved Surface) |
| 16 | Supplying, fabricating and placing in position of RTS rods for reinforcement including cost of steel and binding wire, labour charges etc., complete for RCC works and as directed by TWAD Board Officers. |
| 17 | Providing and fixing of cut stone (Rough dressed) set in CM 1:3 of size 0.45 X 0.45 X 0.15M at site including cost of all materials, mixing, placing position, lifting, vibrating, finishing curing,finishing etc., complete and as directed by TWAD BOARD Officers. |
| 18 | Providing RCC Ventilator of 0.15 m dia using 20mm HBG stone including cost of all materials, centering, shuttering, strutting,reinforcement, placing of concrete, finishing, curing and fixing in position on the roof slab with mosquito proof net arrangement and etc., |
| 19 | S/D of 6KSC PVC Pipe including all cost and conveyances of materials and all labour charges etc., complete. |
| 20 | 90mm 6KSC PVC Pipe |
| 21 | Earth work excavation with an initial lead and lift in hard stiff clay, black cotton, hard red earth, sub murram gravel, stone and earth mixed boulders as per SS20B for pipe laying work. ( including Refilling ) |
| 22 | 90mm 6KSC PVC Pipe |
| 23 | Refilling the excavated trenches including all cost and conveyances of materials and all labour charges etc., complete. |
| 24 | Labour charges for Laying of GI, PVC rigid pipes with lead of 200m lowering into trench, laying in proper grade, alignment, jointing PVC coupler with specials and tested to the required pressure including conveyance of water upto 1km lead during the testing etc., complete. |
| 25 | GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |