| 1 | Providing Delivery line and FHTC 491 at Venkatachalapuram Streets in Pirancheri Panchayat at Manur panchayat union |
| 2 | Earth Work Excavation in all Classes of Soil For Pipeline including all cost and Conveyance etc Complete |
| 3 | Supply and Delivery of 75mm 4KSC PVC Pipe including all cost and Conveyance etc Complete |
| 4 | Laying and Jointing of 75mm PVC Pipe including all cost and Conveyance etc Complete |
| 5 | Refilling Charges including all cost and Conveyance etc Complete |
| 6 | Providing Hose Hold Tap Connection including all cost and Conveyance etc Complete |
| 7 | Earth Excavation and depositing on bank for with an initial lead and lift as per hard gravely soil for pipe line for 20 mm PVC Pipeline for 20 mm PV CPipe |
| 8 | Supply and Delivery of 20 mm dia PVC pipe as per BIS 4985/2000 with ISI Marking to site of works |
| 9 | Lowering and laying the 20 mm dia PVC pipes and specials to trench,laying to proper grade and alignment ,jointing with pvc coupler and specials fixing with solvent cement paste etc.,complete |
| 10 | Re- filling with excavated soil compplying with standard specification in layers of 15cm thick well rammed and consolidated after pipes and specials are laid and tested |
| 11 | 63 x 20mm saddel set |
| 12 | Brass Ferrule 15mm |
| 13 | 15 Lpm Brass Flow Control Vlave (LR) |
| 14 | 15 MM Brass Tap LR |
| 15 | 20mm PVC FTA |
| 16 | 20mm PVC Elbow |
| 17 | 20mm PVC MTA |
| 18 | Cutting of 20mm PVC pipe |
| 19 | Labour charge for drilling, Cutting, Threading and Brass ferrule in distribution pipe. |
| 20 | EARTHWORK EXCAVATION for foundation in hard soil and refilling the sides of foundation |
| 21 | Cement Concrete 1:4:8 mix using 40mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges etc., complete |
| 22 | Cement Concrete 1:2:4 mix using 20mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges etc., complete |
| 23 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officer |
| 24 | Supplying, Fabricating and placin g in position of RTS or MS rod for all reinforced cement concrete works as per design given including cost of steel and binding wire in all floors etc,complete |
| 25 | Reinforced cement concrete in 1:1.5:3 mix using 20mm iss HBG stone jelly and M.Sand for all reinforced cement concrete including conveyance charge to site and all labour charges etc., complete Please Enable Macros to View BoQ information |