| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar (DAR/15.7.4/Based on UPPWD/SOR-2020) |
| 2 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30M and including filling watering and ramming of excavated earth into trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30M from the foundation trenches. (Where machine can not reach/move) (UPPWD/SOR-2020/251(b)) Depth from 0.0 to 1.5 M below G.L. |
| 3 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 |
| 4 | M-150 brick work in 1:4 cement and Coarse sand of ( 2.20 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/303+(305) |
| 5 | 12 mm cement plaster of mix : 1:6 (1cement :6 coarse sand) |
| 6 | concrete with 2cm Guage Stone grit , Coarse Sand& Cement in the proportion of 4:2:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/279a/P-17 |
| 7 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Morth-401 |
| 8 | Providing and laying 80mm thick I.S.I Mark factory made cement concrete interlocking paver block made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of Coarse sand, filling the joints with fine sand and etc. all complete as per the direction of engineer in charge . with conforming to IS-15658 and IRC:SP:63. (AR) |
| 9 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. UP PWD SOR 2020/ DSR-18/10.25.2 |
| 10 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note:- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level. (DAR/5.33.1/Based on UPPWD/SOR-2020)) |
| 11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more./Cold twisted bars. (DAR/5.22.6/Based on UPPWD/SOR-2020)) |
| 12 | Suspended floors, roofs, landings, balconies and access platform (DAR/5.9.3/Based on UPPWD/SOR- |
| 13 | Edges of slabs and breaks in floors and walls: Under 20 cms wide. (DAR/5.9.16.1/Based on UPPWD/SOR-2020)) |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form for all heights :Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) |
| 15 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (DAR/5.9.2/Based on UPPWD/SOR-2020)) |
| 16 | Supply of Good Earth work , banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. |
| 17 | Dry brick on edge flooring in required pattern with bricks of class designation of 150 , including filling joints with sand, with common burnt clay modular bricks. SOR Please Enable Macros to View BoQ information |