| 1 | Dismantling (without damage) one km 11 KV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. |
| 2 | Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 3 | Fitting one set (3No.) 11KV LA and giving connections excluding earthing. |
| 4 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. |
| 5 | providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil. |
| 6 | Providing one Coil earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 7 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite |
| 8 | Fitting one Additional 75x40mm, 1.8m channel cross arm in existing single pole including conveyance of materials |
| 9 | Providing concrete muffing of size 0.45x0.45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. |
| 10 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading&unloading charges. |
| 11 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transporting by any vehicle) |
| 12 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transporting by any vehicle) |
| 13 | Dismantling one damaged 11KV line PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 14 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 15 | Conveyance of one km 11KV line materials from section store/ stacking place to the work site (excluding poles). |
| 16 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and unloading using crane. |
| 17 | fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 18 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. Complete. |
| 19 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 20 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). |
| 21 | Additional rate for reinstalling LT line on the renewed 11KV pole having both HT and LT (HT/LT) lines. |
| 22 | Replacing/inserting HT Stay insulator on the existing stay. |
| 23 | Renewal of existing damaged/broken old 11KV stay to the existing stay rod. |
| 24 | Fitting and providing one HT stay for 11 KV pole, including digging and back filling pit in ordinary soil. |
| 25 | Straightening one slanted 11 KV pole after unbinding the line and binding the line after work |
| 26 | Additional rate for refitting/redoing one Shackle set, including reshacling one span, while renewing any type of LT pole. |
| 27 | Reschackling one span LT three phase 4 wire OH line including pin binding, jumpering, replacing, insulators/cross arm/shackle, tightening stay, cutting tree braches etc. wherever necessary including conveyance of all materials. |
| 28 | Reschackling one span LT OH Additional conductor including pin binding, jumpering, replacing insulators/cross arm,shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials complete. |
| 29 | Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT line. |
| 30 | Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT line. |
| 31 | Dismantling (without damage) one 11KV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same |
| 32 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 33 | Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. |
| 34 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete |
| 35 | Renewing one V cross arm on the 11KV pole including dismantling and conveyance. |
| 36 | Fitting and erecting one HT Double pole stucture using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). |
| 37 | Fitting one set AB switch on existing DP , giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. |
| 38 | Fitting and providing one strut using HT PSC pole including digging and back filling pit in ordinary soil. |
| 39 | Dismantling of Anchor clamp/ dead end clamp for LT AB cable |
| 40 | Erection of Anchor clamp/ dead end clamp for LT ABC of any size |
| 41 | Dismantling of suspension clamp suitable for LT AB cable |
| 42 | Erection of suspension clamp for LT ABC of any size |
| 43 | Stringing of one km 3 PH 11KV line with XLPE Insulated ACSR Raccoon or equivalant (3 conductors) after fitting insulators, binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works. Please Enable Macros to View BoQ information |