| 1 | 2.1:Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means |
| 2 | 2.4.A.1:Uprooting and Removing Stumps & Roots <br> Uprooting and Removing Stumps & roots, compaction of backfilling and stacking of servicable material by manual means as per Technical Specification Clause 201. <br> A. Lead upto 100 m <br>(i) Girth above 300 mm to 600 mm |
| 3 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. |
| 4 | OD42185/2025-2026:Earth filling using contractors earth cut and conveyed from outside in layers exceeding 20cm depth, consolidating each deposited layed by ramming and watering , lead upto 50m and lift upto 1.5m as per direction of site Engineer-in charge |
| 5 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material |
| 6 | OD436889/2025-2026:Providing and laying of Interlocking concrete Block Pavements using 80mm M40hydraulic blocks of approved size ,design & shape ,laid in required pattern overand including a compacted bed of 6,, stone aggregate of 50mm average thickness ,etcall complete as per the direction of Engineers in charge |
| 7 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification(i) Nominal mix (1:2:4) |
| 8 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 9 | OD49522/2025-2026:MoRD DRY RUBBLE MASONRY _ Dry rubble without concrete levelling coursemasonry with good quality blasted rubble including packing to compactness to linesand levels cost andconveyance of all materials labour charges etc. complete as per direction ofDepartmental officers at site |
| 10 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification(i) Nominal mix (1:2:4) |
| 11 | OD49524/2025-2026:Random rubble masonry with hard stone in foundation and plinth including levellingup with cement mortar 1:6 |
| 12 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 |
| 13 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 |
| 14 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) |
| 15 | OD436894/2025-2026:Supplying and fixing in place granite name board of slab area less than 0.90 sqm including engraving and painting letters etc. complete as per direction of Engineer in charge at site. Please Enable Macros to View BoQ information |