| 1 | 1. Providing for Extension of Pipe Line @ Kayan Kadu Kudieruppu in Madhagam Panchayat |
| 2 | Earth work excavation in narrow trenchand depositing on bank with an initial lead of 10m and lift of 2m in all soils |
| 3 | Supply and Delivery of following63mm OD PVC 4KSC Pipes |
| 4 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment |
| 5 | Refilling the excavated earth including all labour charges etc,. Complete |
| 6 | 2. Providing for Extension of Pipe Line @ Madhagam in Madhaagam Panchayat |
| 7 | Earth work excavation in narrow trenchand depositing on bank with an initial lead of 10m and lift of 2m in all soils |
| 8 | Supply and Delivery of following63mm OD PVC 4KSC Pipes |
| 9 | Conveyance of the following rigid PVC Pipes, lowering to trenches and laying to proper grade and alignment |
| 10 | Refilling the excavated earth including all labour charges etc,. Complete |
| 11 | 3. Repairs to RCC Roof Motor Room @ itchikottai in Madhagam Panchayat |
| 12 | Chipping of concrete and roughening the surface |
| 13 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum. |
| 14 | Providing granolethic floor finish with ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum |
| 15 | Plastering with cement mortar 1:3 mix to 10 mm thickincluding cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm |
| 16 | White washing two coats using shell lime including cost and conveyance and all labour charges etc |
| 17 | Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete |
| 18 | Exterior Emulsion over one coat including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete (For OLD Wall) |
| 19 | Painting two coats using Enamel Paint for Old Iron Work including cost and conveyance of all materials to site and all labour charges etc complete |
| 20 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 1 & 19 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |