|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 2 | Supply of Stones (Nallah) including dumping stone . in Horizontal on level |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 7 | CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) |
| 8 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: |
| 9 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) |
| 10 | Supply of EC Poly Bags |
| 11 | Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand. |
| 12 | Loading/Unloading sand/ earth filled bags in lorries; lead upto 50m. |
| 13 | Placing of sand/earth filled bags in position (Dry) |
| 14 | Carriage of material by mechanical transport, from source to road site of work including loading / unloading and stacking Stone Aggregate 20mm Avg lead 08km |
| 15 | Stone Aggregate 40mm Avg lead 08km |
| 16 | Sand Avg Lead 15Km |
| 17 | Cement Avg lead 1km |
| 18 | Steel Avg lead 5km |
| 19 | Good Earth Avg 10km |
| 20 | Carriage of material by Manual Means from road site to site of work including loading, unloading and stacking through an average lead of 100mStone Aggregate 20mm |
| 21 | Stone Aggreate 40mm |
| 22 | Cement |
| 23 | Steel |
| 24 | Good Earth Please Enable Macros to View BoQ information |