| 1 | OD514266/2025-2026:Providing and fixing HDPE pipes including jointing of pipes with one step HDPE solvent cement, trenching, refilling amp; amp; testing of joints complete as per direction of Engineer in charge, 180mm |
| 2 | 18.59.3:Providing and fixing C.I double acting air valve of approved quality with bolts, nuts, rubber insertion etc. complete ( The tail pieces, tapers etc. if required will be paid separately):100 mm dia |
| 3 | OD522295/2025-2026:supply and fixing CI non return valve, confirming to IS 5312 part I 1984, PN 1.0 size 200mm, by providing nuts, bolts, rubber insertions etc. |
| 4 | 4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts |
| 5 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 6 | 2.13.1.1:Excavating trenches of required width for pipes, cables, etc, including excavation for sockets, depth up to 1.5 m including getting out the excavated materials, returning the soil as required in layers not exceeding 20 cm in depth. including consolidating each deposited layers by ramming, watering etc., stacking serviceable material for measurements and disposal of unserviceable material as directed, within a lead of 50 m:Ordinary rockPipes, cables etc. not exceeding 80 mm dia |
| 7 | 26.30.1:Drilling suitable holes in reinforced or plain cement concrete with power drivendrill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels,columns and slabs to introduce steel bars for sunshades/balconies includingfixing the steel bars in position using epoxy resin anchor grout of approvedmake but excluding the cost of reinforcement, all complete as per direction ofEngineer-In-Charge.Upto and including 12mm dia. |
| 8 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. |
| 9 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 10 | 18.17.4:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :50 mm nominal bore |
| 11 | OD522475/2025-2026:supplying and fixing 150mm dia GI pipes complete with G.I fittings including trenching and refelling etc., |
| 12 | OD522542/2025-2026:Labour Please Enable Macros to View BoQ information |