| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: CE/NCTPS-I Name of Work: NCTPS–I - CM Circle – CM-II– Providing repair works and laying weathering tiles to Telephone exchange building at Vallur camp. Contract No: CE/SE/CM/NCTPS-I/171/2025-26 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | NCTPS–I - CM Circle – CM-II– Providing repair works and laying weathering tiles to Telephone exchange building at Vallur camp. |
| 3 | Providing and fixing in position Solid PVC Door Shutters using 19 Gauge 19mm MS square tubes for styles and outer frames. 15mm MS square tubes for top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC Sheets. Shutter using 5mm thick solid PVC Sheets for panelling shall rigidly fixed in position including necessary furniture and fittings. The over all size of styles shall be 50mm x 30mm. The over all size of top rail, lock rail and bottom rail shall be 75mm x 30mm. The over all size of frames shall be 50mm x 45mm with suitable rabate for housing the shutter. |
| 4 | Patch plastering the wall in cm 1:5 mix 12 mm thick over brick wall after removing the peel off/ damaged plaster surface as directed at site including the cost of all materials, labour, lead, lift, T&P etc., complete. |
| 5 | Colour washing two coats over the inner wall surface with plastic emulsion after thorough scrapping, cost of all materials, suffolding labour, lead, lift, cuting, water charges etc complete. |
| 6 | Colour washing two coats over the exterior wall surface with exterior plastic emulsion after thorough scrapping, cost of all materials, suffolding labour, lead, lift, cuting, water charges etc complete. |
| 7 | Painting two coat with ready mixed enamel paint of approved quality over the wooden surface including scrapping, clean removal of dirt, labour charges, cost of paint, etc., complete. |
| 8 | Painting the ornamental M.S. grill works with two coats of enamel paint including labour charges, thorough scrapping, clean removal of dirt, etc., complete |
| 9 | Supplying and fixing in position best quality PVC 110mm dia down take pipe - 6kg/sq.cm, having ISI mark including the cost of PVC pipe, all materials, labour, lead, lift, T&P, etc., complete. |
| 10 | Dismantling the Pressed Tiles & Weathering Course, including cost of all labour, T&P's, transporting the debries away from the site, etc., complete as directed by the Engineer at the site. |
| 11 | Laying Cool roof tiles/white roofing tiles of size 300 x 300 x 10 mm in CM 1:3, 20mm thick mixed with Conplast X421 IC @ 200 ml per bag of cement over the roof surface after dismanlting the pressed tile, with proper slope including the cost of all materials, labour, lead, lift, T&P, transportation etc complete. |
| 12 | Dismantling the existing PCC including clearing the debris and disposing them all lead, lift, etc., complete as directed by the Engineer at site. |
| 13 | Providing brick work in CM 1:5 using second class moulded country bricks/fly ash bricks including cost of all materials, labour, lead, lift, transporting charges, finishing, curing, etc., complete as directed by the Engineer at site. |
| 14 | Providing stone dust including cost of all materials, labour, lead, lift, etc., complete as directed by the Engineer at site. |
| 15 | Providing PCC 1:3:6 using 40mm HBG metal including cost of all materials, labour, lead, lift, etc., complete as directed by the Engineer at site. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |