| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: CE/NCTPS-I Name of Work: NCTPS–I - CM Circle – CM-I – Replacement of damaged rolling shutter for Indoor switch yard, DG house and allied civil works at NCTPS-I. Contract No: CE/SE/CM/NCTPS-I/168/2025-26 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Scope of Work Item Code / Make Quantity Units HSN / SAC CODE Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE for Work portion in figures to be entered by the Bidder Rs. P BASIC RATE for Labour charges of Erection portion Rs. P BASIC RATE for consumables charges of erection portion Rs. P Packing & Forwarding Charges in percentage Freight & Insurance charges in precentage GST in percentage IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | NCTPS–I - CM Circle – CM-I – Replacement of damaged rolling shutter for Indoor switch yard, DG house and allied civil works at NCTPS-I. |
| 3 | Dismantling the Existing damaged Rolling shutter including cost of all labour, materials, lead, lift, transporting, scaffolding and devoluted to store etc., complete. |
| 4 | Supplying and erecting pull and push type rolling shutter with ISI make of approved quality size and section using 18GI sheet and the shutter sheel be painted with one coat of red oxide primer and the rate inclusive of hood, cover, transporting charge,lead, lift, materials, labour charges etc., complete. |
| 5 | Painting two coats of enamel paint of first class approved quality and colour through cleaning and washing the surface removing dirt algae etc., including necessary plaster of paris, putty where ever required including all cost of materials, labour,labour, lead, lift, scaffolding etc., complete as per directed by the Engineer at site. |
| 6 | Clean removal of cement plaster from brick wall and racking 12mm deep and same debris away low lying area from the site including cost of all labours, lead, lift etc., complete. |
| 7 | Plastering in CM 1:5,12mm thick mixed with conplast @ 150ml per bag of cement including the cost of all materials, labour, lead, lift, curing T&P etc., complete. |
| 8 | Chipping of concrete and roughening the column plaster surface and same debris away from low lying area of the site including cost of all labour, lead, lift T&P etc., complete. |
| 9 | Plastering in CM 1:3, 10mm thick including cost of all materials, lead, lift, labour, shuttering charges etc., complete. |
| 10 | Painting the existing damaged plastered wall surface with one coat of white cement washing over twp coats of exterior plastic emulsion paint to matching existing colour including cost of all materials labour, lead, lift etc., complete and as directed by the engineer at site. |
| 11 | Painting one coat of enamel paint of first class approved quality and collour through removing old paint from iron surface with sand paper including cost of labour, lead, lift, etc, complete. |
| 12 | Providing and fixing steel checker plate using of 10mm thick and 'L' Angle of 8mm tK for using Indoor switch yard steps and switch yard main gate including cost of all materials lead, lift, etc., complete. materials, lead, lift, etc., complete as directed by the Engineer at site. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |