| 1 | Dressing and chilchalling Road flanks including cutting and filling with earth up to 150 mm average thickness finished with outward cross-grade of 1 in 30. (Extra quantity of earth for filling shall be obtained from road side borrow pits) |
| 2 | Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint.b) Two Coats |
| 3 | Earthwork in excavation from borrow pits (land owned/arranged by the Department) and depositing in layers of 250 mm. including breaking clods in embankment works and to fill up back of abutments, depressions and ruts with an initial lead up to 50 m and initial lift up to 1.5 m making bunds |
| 4 | Bamboo Pile Walling made of 6.5cm to 7.5cm diabamboo (in single line) driven about half-length intoground at very close spacing of 30cm c/c side by side, with stout stays at an interval of 90cm fixed with bamboo post of length 1.25m driven 1m below G.L., 3 nos. of half split bamboo runner of same dia fitted and fixed with nails etc. and lining exposed portion with sheets made from cut drums (empty bitumen drums) fitted and fixed with a lap width of 100 mm at each joint, complete as per direction including the cost of drum sheets and including the cost of nails, wires etc.(ii) With bamboos of length above 2.00m andupto 2.50m |
| 5 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 6 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 7 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 8 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 9 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 10 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 11 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 12 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 13 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 14 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 15 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 16 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 17 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 18 | Supplying and Filling empty Cement bags with dry sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but including cost of sand and gunny bags. |
| 19 | Plain / Reinforced Cement Concrete in Open foundation with or without reinforcements, in any part of foundation of bridges / culverts with graded stone chips of appropriate nominal sizes, including screening and cleaning of coarse aggregates, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, cost of curing with water, including cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge, cost for quality control, sampling, testing etc. including cost of formwork but excluding reinforcement complete as per drawing and technical specifications. A) PCC M20 Grade |
| 20 | Add GST @ 18% |
| 21 | Add Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |