| 1 | Item No. 1 :- Excavation for foundation / pipe trenches in earth soil of all type sand gravel and soft murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for etc. complete |
| 2 | Item No. 2 :- Excavation for foundation / pipe trenches in hard murum & boulders including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for etc. complete |
| 3 | Item No. 3 :- Excavation for foundation / pipe trenches in soft rock including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for |
| 4 | Item No.4 :- Excavation for foundation / pipe trenches in hard rock by blasting including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed etc.completeLift 4.50 M to 6.00 m |
| 5 | Lift 6.00 M to 7.50 m |
| 6 | Lift 7.50 M to 9.00 m |
| 7 | Lift 9.00 M to 10.50 m |
| 8 | Lift 10.50 M to 12.00 m |
| 9 | Item No.5:- Providing and laying in situ Cement concrete in proporation .... of trap metal for foundation and bedding, including balling out water manually, formwork, compacting and curing etc. complete.P.C.C M-150 |
| 10 | Item No. 6:- Providing & costing in constructing in situ. C.C of trap granite/ quartzite / gneiss/ metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering , ceterind from work,compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum thickness to give a smooth & even surface wherever necessary or roughening if spetial finish is to be provided & curing etc. complete. ( By weight batching & mix design for M-250 & M-300 only use of L&T, ACC Ambuja, Birla Gold, Manikgad, Rajashree etc. cement is permitted excluding M.S or Tor reinforcement in R.C.C. M-250grade. 1) R.C.C. M-200 for Beam |
| 11 | 2) R.C.C. M-200 for vertical wall |
| 12 | Item No.7:- Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes,caps,footing,foundation,slab,beams,columns,canopies, staircase, newels,chajjas, lintels,pardies,coping,fine arches etc. as per detailed designs, drawing & schedule s including cutting,bending,hooking the bars,bindingwith wires or tack welding & supporting as required etc. complete (including cost of binding wire). Tor steel |
| 13 | Itemno:8 :- Providing & laying weep holes of 90 mm AC/PVC pipe as per drawing for abutment returns, return walls etc. complete. |
| 14 | ItemNo.9 :- Dewatering the excavatyed trenches and pools of water by using pumps and other devices including disposing of the water to safe distance as directed by Engineer-in-Charge (including cost of machinery labour fuel etc complete. |
| 15 | Item No.11 :- Providing uncoursed rubble masonry of trap / granite / quartzite /gneiss stones in cement mor tar 1:6 in foundation and plinth of innerwalls / in plinth of external walls including bailing out water manually, striking joints on un exposed faces and watering etc.complete. |
| 16 | Itemno:12 :- Reffiling the trenches with approved excavated material from foundation in 15cm to 20cm layers including watering and compaction etc. complete. |
| 17 | Item No.13 :- Providing and fixing 90 cm x 60 cm Marble plate engraving 10 cm. height letter, figures including painting the lefters/figures with approved colour and shade complete |
| 18 | Item No.14 :- Test report chargesConcrete cube test (set of 3 cubes = 1 Test) |
| 19 | Steel tension test (set of 3 bars = 1 Test) |
| 20 | Add 18% GST Please Enable Macros to View BoQ information |