|
| 1 | Dry earth work in foundation for concrete/masonary work on channel of discharge below 10 cumec including lead upto 30m lift upto 1.50 m and its disposal and back filling. |
| 2 | E/w in construction and remodeling/removing theck of drains/escape with partial dressing including all lead and lift and proper completion of work in all respect. |
| 3 | E/w for repairing and dressing of canal, making/widening of embankment of service road, back filling etc. by any means including all lead and lift and proper completion of work in all respect. |
| 4 | Earth work in embankments By power transport for a lead of upto 1 km including excavation loading unloading manual compaction and dressing including all lifts rates shall be applicable for lead beyond 630 m and upto 1 km |
| 5 | Dismantaling of brick work in cement mortar including stacking of dismantled materials as directed by engineer-in- charge within a distance of 60M. |
| 6 | Dismantalling Reinforced cement concrete including stacking of dismantled materials as directed by Engineer-in-charge within a distance of 60 M |
| 7 | Sand filling including supply of necessary quantity of sand including watering, dressing etc. rate includes cost of all material, labour and T&P etc required for proper completion of the work. |
| 8 | Providing and laying in M-15 cement concrete including supply of all materials, labour, T&P with centering, shuttering etc. required for proper completion of work |
| 9 | Providing and laying RCC M-30 including supply of all materials, labour and T & P with centering, shuttering etc. required for proper completion of work |
| 10 | Providing and laying RCC M-25 including supply of all materials, labour, T & P with centering, shuttering etc. required for proper completion of work. |
| 11 | Cutting bending, binding & placing in position HYSD bar Reinforcement including cost of all material, labour and T&P etc. required for completion of work with complete as per Drawing and Technical Specifications. |
| 12 | Providing weep holes in Brick masonry/Plain/Reinforced cement concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications. |
| 13 | Providing and fixing drainage spouts as per drawings and Technical Specifications. |
| 14 | Painting two coat of synthetic enamel paint on new surface with superior quality approved make on concrete surface including cost of all material, labour T&P required for proper completion of work. |
| 15 | Supplying & Laying of Mirzapur Stone Boulder in GI Wire Crate mesh size 200x200 mm with 8 SWG GI wire) for flexible Appron including cost of all material, labour, T&P etc complete. |
| 16 | Brick soling with straight over burnt bricks laid on edge and dry including preparation of sub grade to prescribed camber filling joints with local earth spreading binding coat 1 cm (3/8 \\") depth of local earth over the entire surface and including labour and T&P etc required for proper completion of work. |
| 17 | Shuttering work for cement concrete works including cost of material, labour T&P , fixing and removal etc for proper completion of work. |
| 18 | Laying R.C.C in 1:1.5:3 with crushed stone grit size 4.75 to 20 mm and C-sand including cost of all material, labour, T&P etc. required for completion of work. |
| 19 | Supply and laying LDPE film 200 micron thick in bed and side slope over filler material including cost of all material, labour etc.required for proper completion of work. |
| 20 | Laying 75 mm thick C.C 1:1.5:3 grade with crushed stone grit size 4.75 to 20 mm and coarse sand for lining by manual in bed and side slope including cost of all material, labour and T&P etc. required for proper completion of work. |
| 21 | P.C.C. in 1:2:4 in cement, coarse sand and 20-40 mm stone ballast in foundation including cost of material labour and t&p etc. required for proper completion of work. |
| 22 | Supplying and laying of 200 GSM geotextile sheet below pitching including all cost of matarial labour T&P etc. required for proper completion of work. |
| 23 | Supplying and pitching mirzapur stone boulder on slopes for protection of bank including cost of material, labour and T&P etc. complete in all respect. |
| 24 | Supplying and pitching mirzapur stone boulder for Toe wall including cost of material, labour and T&P etc. complete in all respect. Please Enable Macros to View BoQ information |