| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. The contractor has to defect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/ cum.Excess/less cement used as per design mix is payable/recoverable separately).All works upto plinth level |
| 5 | Extra for providing richer mixes at all floor levels.Note:- Excess/less cement over the specified cement content used is payable /recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum) |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo mechanically treated bars of grade FE-500 or more. |
| 10 | Providing and placing in position 100 mm thick factory made machine batched & machine mixed Precast RCC Rectangular Covers on drains of footpath of various sizes, of M-25 grade cement concrete for RCC work, including cost of centering, shuttering, reinforcement of 8 mm dia TMT bars of Fe 500 grade @ maximum 100mm c/c on both ways , neat cement punning on finished surface, properly encased on all edges with 1.6 mm thick , 100 mm wide MS sheet duly painted over priming coat , reinforcement to be welded at edges with MS sheet and providing 2 Nos. 12 mm dia bar for hooks etc i/c cost of cartage, all leads & lift, handling at site etc. all complete as per direction of Engineer-in-Charge. |
| 11 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
| 12 | P/L Following size of PVC pipes 10 kg/cm2 with required PVC standard special confirming to IS codes with latest amendment and lowering the same trenches and laying true to alignment and gardient complete i/c the cost of cutting of pipes for making up to length and making joints i/c cost of socket, plstochem PV-85 pvc solvent cement complete. PVC pipe must be confirming to IS : 4985-2000 with latest amendment. Make-Finolex Industries Ltd./Kisan/Supreme Industries Ltd) 160 mm dia with coupler @ 10 kgf/cm2 pressure with i/c all PVC standard specials. |
| 13 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 14 | Empty bag filling by Sand Supply and laying of Sandy Earth Plastic Cement Bags Volume 0.035Cum including Cost of Earht Cots of Empty Bags, Labour Stiching with Safely complete laying and placing complete at the Place of Resoration of Embankment. |
| 15 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 16 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 17 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 18 | Disposal of building rubbish/malba/similar unserviceable dismentaled or vaste material by macanical means including loading transporting unloading to approved municipal dumping ground or as approved engineer incharge beyond 50 mtr. Initial leads for all leads including all lift's involved. |
| 19 | Providing and erecting 2.00 metre high temporary barricading at site as per drawing/ direction of Engineer-in-Charge |
| 20 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. (Nominal concrete 1:3:6 or richer mix (i/c equivalent designmix) |
| 21 | Removing mortar from bricks and cleaning bricks including stacking within lead of 50 m (stack of cleaned bricks shall be measured)from brick work in cement motar |
| 22 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 150 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 23 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) |
| 24 | Neat cement punning. Please Enable Macros to View BoQ information |