| 1 | Excavation for road work in soil with hydraulic excavator of 0.9cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment locations with all lifts & leads up to 1000m.as per approved Drawing & Technical Specifications and as per Clause - 301 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 2 | Sand filling in Road work & foundation of structure as per approved Drawing & Technical Specifications and as per Section - 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete. |
| 3 | P.C.C. M-15 Grade in foundation bed as levelling course using 40mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts as per approved Drawing & Technical Specifications and as per Section - 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. |
| 4 | P.C.C. M-15 Grade in foundation bed with formwork of structure & CD work using 40mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts as per approved Drawing & Technical Specifications and as per Section -1500, 1700, 2100 & 2200 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. |
| 5 | Laying Reinforced cement concrete pipe NP4 of 1200mm dia for pipe culvert on first class bedding in single row including fixing collar with cement mortar 1:2 as per approved Drawing & Technical Specifications and as per Section -2900 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete. |
| 6 | Laying Reinforced cement concrete pipe NP4 of 1000mm dia for pipe culvert on first class bedding in single row including fixing collar with cement mortar 1:2 as per approved Drawing & Technical Specifications and as per Section -2900 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete. |
| 7 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres as per Technical Specifications and as per Clause 305.4.3 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 8 | Re-working of scarified bituminous surface suitably after supplementing base materials with sand and compacting finished surface as per Technical Specifications and as per Clause - 501.8.3.2 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. |
| 9 | Providing G.S.B. Gr-vi stone screaning materials, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, as per approved Drawing & Technical Specifications and as per Clause - 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. |
| 10 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per Table 600.1, cement content not to be less than 150kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver and compacting with vibratory roller, finishing and curing as per Clause 601 of MoSRT&H Specifications for Road & Bridge works (4th Revision) |
| 11 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing and as per Clause 602 of MoSRT&H Specifications for Road & Bridge works (5th Revision) |
| 12 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes as per Technical Specifications and as per Clause - 803.4 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 13 | Providing and fixing of 90cm equilateral triangle size retro-reflectorised, cautionary, mandatory and informatory sign as per IRC-67 made of high intensity grade sheeting vide clause 801.3 ,fixed over aluminium sheeting, 1.5mm thick supported on mild steel angle post 75m x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing. |
| 14 | Providing and fixing of 60cm circular size retro-reflectorised, cautionary, mandatory and informatory sign as per IRC-67 made of high intensity grade sheeting vide clause 801.3 ,fixed over aluminium sheeting, 1.5mm thick supported on mild steel angle post 75m x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing . |
| 15 | Providing and fixing of 80cm x 60cm rectangular size retro-reflectorised, cautionary, mandatory and informatory sign as per IRC-67 made of high intensity grade sheeting vide clause 801.3 ,fixed over aluminium sheeting, 1.5mm thick supported on mild steel angle post 75m x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing . |
| 16 | Providing & erecting a \\"W\\" metal beam crash barrier comprising of 3mm thick corrugated steel metal beam rail, 70cm above road/ ground level fixed ISMC series channel vertical post 150mm x 75mm x 5mm spaced 2m centre to centre, 1.8m high, 1.1m below ground / road level, all steel part & filments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause-811 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 17 | R.C.C. M-20 grade in Foundation raft of RCC Box culvert with formwork using 20mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts as per approved Drawing & Technical Specifications and as per Section -1500, 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete.Foundation Raft |
| 18 | Sub-Structure |
| 19 | Super-Structure |
| 20 | Straightening bent up or coiled M.S. rod or HYSD steel (Fe-415 / Fe-500), cutting, bending, cranking, hooking, welding or jointing (if required), the M.S. rod or HYSD steel and binding, tying the grills, hoisting, lowering and placing in proper position as per drawing & design required for R.C.C. works including cost, conveyance and taxes of M.S. rod or HYSD steel and binding wires of 18 to 20 gauge and labour with all T&P required for the work etc. complete as per approvrd drawing and technical specification and as per clause-1600 of MoSRTH specification for road & bridge works (Latest Revision ) complete in all respect as directed by Engineer-in-Charge.(weight of binding wires will not be considered for payment and payment will be made on weight of M.S. rod or HYSD steel only. Steel bars of only MAJOR INTEGRATED STEEL PLANTS like SAIL, RINL, TATA, JINDAL & SHYAM STEEL, etc. of Fe-415 / Fe-500 grade are to be used in the work & if required original bill of . steel has to be produced by the contractor) |
| 21 | Providing Weep Holes of 100mm dia using A.C./ PVC pipe including fixing with cement mortar as per approved Drawing & Technical Specifications and as per Clause -2706 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete. |
| 22 | Providing R.C.C. Crash barrier at the edge of the road,approaches to bridge structure and medians constructed with M-40 grade concrete with HYSD reinforcement confirming to IRC:21 and dowel bar 25 mm dia 450 mm long at expansion joints filled with pre moulded asphalt filler board , keyed to the structure on which it is built and installed as per design given in enclosure to M.O.R.T.H Circular No. RW?NH- 33022/1/94: DO III Dt. 26.6.1994 as per dimension in the approved drawing and at locations directed by the Engineer in charge including watering ,curing, cost conveyance royalties aof all materials with all labour required for the work complete in all respect. |
| 23 | Providing, Fitting & Fixing of Drainage Spouts in Deck slab as per approved Drawing & Technical Specifications and as per Section 2700 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance & other taxes of materials, cost of labour, T&P etc complete. |
| 24 | Painting two coats with synthatic enamel paints over a coat of primer on any elevation on road kerb, parapet and guard post for finished item of work including cost, conveyance & other taxes of materials, cost of labour, T&P etc complete as per the direction of the Engineer-in-charge. |
| 25 | Dismantling Precasted / Reinforcement cement concrete of grade M-20 and above including T&P and scaffolding wherever necessary, sorting the dismantled materials disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m etc.complete as per Clause -202 of MoRT&H Specifications for Road & Bridge works (5th Revision). |
| 26 | Removing of Hume pipes of above 600mm to 900mm dia and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works including T&P, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Please Enable Macros to View BoQ information |