Name of Work:- Construction of FPE Ong left from Ong bridge to Sansamura from RD 00m to 1200m.(Working RD from 00m to 510m.)
Sl. No.
Item Description
1
Clearing and grubbing land in canal slope work including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thick as per direction of Engineer in charge.
2
Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete.
3
Earth work in filling of any approved type of soil from approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 1 Km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.5 cm layers to make ready for watering earth work upto OMC condition and compaction with PRR in embankment for all heights including construction, maintenance, watering and lighting of haul road and borrow area and hire & running charge of all machinaries,royality,cess etc. complete as per the direction of Engineer-incharge. (measurement of the fill to be taken on the finished compacted section under OMC condition.)
4
Rough stone dry packing in aprons and revetments with H.G.broken stones,30cm and above size filling the interstices with spalls small stones including cost,conveyance,royalty and all taxes etc.complete as per direction of Engineer-In-Charge.
5
Fine dressing and turfing the slopes of the dam / dyke / canal embankment with compacted dub grass with initial lift and lead including all labour T&P required for the work in all respect as per the direction of the Engineer in charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.