| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (DSR No.2.8.1) |
| 2 | Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS : 8329 : (i) 100 mm dia pipe (DSR No 18.72) of Make ELECTRO STEEL/ JINDAL/ TATA/ Welspun |
| 3 | 150 mm dia pipe of Make ELECTRO STEEL/ JINDAL/ TATA/ Welspun |
| 4 | Providing push-on-joints to centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and the cost of rubber gasket. 100mm dia pipes. ( DSR No.18.70.1) |
| 5 | 150mm dia pipes. (DSR No.18.70.2) |
| 6 | Labour for cutting C.I./D.I. pipe with steel saw. 100mm dia (DSR No.18.83) |
| 7 | 150mm dia (DSR No.18.83) |
| 8 | Providing and fixing of C.I. specials ISI marked including cost of pig lead, hemp yarn, nut bolt, rubber sheet etc. complete in all respects. (NSI) |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m ( DSR No.2.25.) |
| 10 | Supplying, laying, jointing & testing, commissioning of 100mm dia D.I. Sluice Valve Resilient seated PN-10 including the cost of rubber packing, nut & bolts, carriage, loading unloading complete in all respects make: AVK / IVC/ Kirloskar/ Talis/ Sigmaflow. (NSI) |
| 11 | 150mm dia (NSI) |
| 12 | Construction of brick masonry chamber for sluice valve & scouring including excavation 1st class brick work in cement sand mortar 1.6 cement conc. 1:5:10 complete in all respects. Internal size 3’ x 3’ x 4’. (NSI) |
| 13 | Providing and fixing RCC cover 1:2:4 of 3” thickness including cost of steel winding wire etc. complete in all respects. (in two parts) (NSI) |
| 14 | Extra for cutting through, metalled road and stacking the material outside complete in all respect.(NSI) |
| 15 | Supplying and filling of sand under road cut portion including cost of watering ramming consolidating and dressing complete in all respects. (Sand will be taken from C&D waste plant of M.C. Chandigarh. .(NSI) |
| 16 | Dewatering with the help of dewatering pump including cost of gent set complete as per entire satisfaction of EIC (NSI) |
| 17 | Labour for making arrangement for connection with existing line including cost of excavation, cutting, joining, alignment placing caution board etc. complete in all respects. Proposed 4” i/d to Existing 4” i/d (NSI) |
| 18 | Proposed 6” i/d to Existing 6” i/d (NSI) |
| 19 | Note :- (i)Less against C l Scrap @Rs. 40/ Per Kg (ii)If JCB will be provided by Deptt. (Govt. JCB) in repair work then recovery will be made @Rs.850/-Hr Please Enable Macros to View BoQ information |