| 1 | Earth work in excavation by Mechanical means ( Hydraulic excavator) manual means over areas (exceeding 30cm in depth 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, and excluding of disposed earth to be leveled and neatly dressed (DSR 2.6.1-2.36) |
| 2 | Carriage of earth by mechanical transport including loading, unloading Lead of 2 km complete in all respect to the entire satisfaction of the Engineer-In-Charge. |
| 3 | Preparation of sub grade including trenching rough dressing of soil, final dressing of soil, final dressing of earth to give level and camber, watering, rolling with a road roller and compaction of bed complete in all respect |
| 4 | Providing and laying sand filling in plinth with choe sand under floor including, watering, ramming, consolidation and dressing complete in all respect to the entire satisfaction of the Engineer-in-charge |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) DSR 4.1.10 |
| 6 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR 6.1.1) |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level: 1:1.5:3(1 Cement: 3 graded stone aggregate 20 mm nominal size) 4.1.2 |
| 8 | 15 mm cement plaster on the rough side of single or half brick wall of mix :1:4 (1 cement: 4 fine sand) (DSR 13.5.1) |
| 9 | Providing and laying cement concrete in retaining walls, return walls(any thickness) including columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks,anchor blocks, plain window sills, fillets etc. upto floor level five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)DSR 4.2.3 |
| 10 | Extra for providing and mixing water proofing material in cement mortar plaster work in doses by weight of cement as per manufacturer's specification. |
| 11 | Providing and applying JK putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. (DSR 13.26) |
| 12 | Finishing walls with acrylic Smooth exterior paint of required shade:- New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 Kg/ 10 sqm. (DSR 13.46.1) |
| 13 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. :Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix). DSR 15.2.2 |
| 14 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. (DSR 15.7.4) |
| 15 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. (DSR 15.60) |
| 16 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in- Charge. (DSR 16.82) |
| 17 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.(D.S.R-16.83) |
| 18 | Providing and fixing PCC kerbs of size 2’-0” x 9” having 4” thickness at bottom and 3” thickness at top and made of plain cement concrete 1:2:4 duly vibrated and compacted. The rates also includes the cost of filling and pointing of joints between kerbs with cement mortar 1:4 (1 cement 4 course sand) Complete in all respect to the entire satisfaction of Engineer In Charge. |
| 19 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 20mm Cement Mortar 1:3 complete as per the directions of Engineer-In-Charge. |
| 20 | Providing and laying 60mm thick high density factory made cement Concrete interlocking paver blocks of M-30 grade made by rubber mould table type platform and of approved size and design /shape laid in required colour and pattern over and including 20mm Cement Mortar 1:3 complete as per the directions of Engineer-In-Charge. |
| 21 | Providing and fixing of PVC pipe 6kg/cm2 ( 6\\" dia ) in ground including the cost of specials like color, tee bends, end excavation, trenching , refilling laying, lowering jointing with solevent, testing and commissioning complete in respect (NSI). |
| 22 | Providing and Fixing of D.I sluice valves 6\\" (with cap) IS marked completed with bolts, nuts, rubber insertion, carriage, loading, unloading etc. ( the tail piece if required will be paid separately). |
| 23 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. as required. (DSR 10.25.2) |
| 24 | Labour for Making Connection with Existing pipe line. |
| 25 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work. (DSR 14.54.1) Please Enable Macros to View BoQ information |