| 1 | Supply Installation Testing & Commissioning of 30 KVA UPS UPS, 30 KVA UPSTopology – Fully Digital twin DSP Controlled Wide input Voltage tolerance (+20%,-20%) Parallel model Operation compatible Internal Air Handling capability Conformal coating on PCB Higher Short circuit current Handling capability Inbuilt Maintenance & Static Bypass Backfeed Protection Short Circuit Protection Battery Circuit Breaker Inbuilt isolation Transformer. providing all time uninterrupted power supply as required of make Emerson / Vertiv Make / FUJI ELECTRIC model Liebert Super 600D or equivalent as per ISO standards and as per instruction of the engineer incharge |
| 2 | Hiring of light / led board Supply, installation, testing, and commissioning of high-brightness outdoor/indoor LED display board OF 118 inches and above with P4 pixel patch for event/advertisement purposes. The scope includes transportation, mounting, power cabling, content display support, and on-site technical assistance for the full hire duration. |
| 3 | 8.5 TR AHU Type Air Conditioner Indoor and Outdoor unit with wet wash servicing.— Complete preventive maintenance including cleaning of AHU filters, coils, blower, drain line, and housing; inspection and lubrication of blower motor; checking of electrical connections, control panel, belts, and bearings; high-pressure coil cleaning of outdoor unitand ensuring proper cooling efficiency. As per engineer incharged . |
| 4 | Rewinding of ODU Condenser fan Motor ic — Dismantling of existing fan motor, complete rewinding with high-quality super-enameled copper winding wire, replacement of damaged insulation materials, varnishing, bearing check/replacement (if required), reassembly, balancing, and testing for proper RPM, vibration, amperage and smooth operation. Includes labour, rewinding materials, and performance testing after reinstallation. As per engineer incharge . |
| 5 | Repairs to stage movable curtains motors which include 32 Ams Connector and Power Connector Replacement.Supply and installation of heavy-duty industrial-grade connectors compliant with suitable for 415V/50Hz 3-phase power distribution. Scope includes removal of existing burnt/damaged connectors, termination of copper armored cable using tinned copper lugs, proper crimping with hydraulic crimping tool, heat-shrink insulation, . As per engineer incharged . |
| 6 | Replacement of Indoor PCB Card Repair of AHU as required by engineer incharge |
| 7 | AC Gas Leak Test R.22-Ac gas Top Up for 8.5 TR AHU Complete leak inspection of air-conditioning system using nitrogen pressure testing, soap-solution tracing and electronic leak detector. Includes evacuation of system through deep vacuum using rotary vacuum pump , rectification of minor leaks at flare joints/valves, charging of required refrigerant (R22 as applicable) using digital manifold gauge and weighing scale for accurate refrigerant quantity. Work includes suction/discharge pressure check, superheat & subcooling verification, compressor load test, and confirming cooling performance. All labour, nitrogen, refrigerant gas, valves tightening, and standard consumables included. |
| 8 | Cassete AC Gas Leak Test and Gas Check Charging Complete leak inspection of air-conditioning system using nitrogen pressure testing, soap-solution tracing and electronic leak detector. Includes evacuation of system through deep vacuum using rotary vacuum pump , rectification of minor leaks at flare joints/valves, charging of required refrigerant (R22 / R410A / R32 as applicable) using digital manifold gauge and weighing scale for accurate refrigerant quantity. Work includes suction/discharge pressure check, superheat & subcooling verification, compressor load test, and confirming cooling performance. All labour, nitrogen, refrigerant gas, valves tightening, and standard consumables included. |
| 9 | Supply and Installation of Single-Phase Preventer (SPP) in outdoor unit of 8.5 TR ductable ac unit — AC systems to protect compressor/motor from phase failure, phase reversal, and phase unbalance. Includes removal of faulty unit, proper wiring termination, tightening of lugs, load-side and line-side connection verification, calibration of trip settings |
| 10 | Split AC Wet servicing 1-2 TON which includes cleaning of filters, coils, blower, drain line, lubrication of blower motor; checking of electrical connections, control panel, belts, and ; high-pressure coil cleaning of outdoor unit and ensuring proper cooling efficiency. |
| 11 | Replacement of split AC compressor faulty Removing defective compressor, installing new unit with proper brazing, leak testing, vacuuming, and refrigerant charging. Includes full performance testing and required labour/consumables in museum . |
| 12 | S.I.T.C 63A Contactor . Supply, installation, testing & commissioning of 63A contactor, including removal of old connector, proper cable termination with lugs, tightening, insulation, continuity check and ensuring safe operation. As per engineer incharge.. |
| 13 | Replacement of damaged air filter,of AHU 8.5 TR including , cleaning of filter housing, installation of new filter, and checking proper airflow and cooling performance. |
| 14 | Hiring of Scaffoldings for the WorkHiring of scaffolding includes providing, erecting, adjusting, and dismantling safe and stable scaffolding structures as required for construction or maintenance work, complete with necessary materials, and safety measures.” Please Enable Macros to View BoQ information |