| 1 | Labour for SiteClearance…do…..do…all complete job as per specification and direction ofg E/I. |
| 2 | E/W in excavation in foundation trenches in ordinary soil(vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50m including all lifts,levelling,ramming,the foundation trenches,removing roots of trees and extra for earthwaork in hard soil(vide classification of soil item-B)...do.....do.....E/I |
| 3 | Providing stone dust filling in road…do…do…E/I (dust=300.00 +labour=115.49)=415.49 10% C.P.=41.54 4.5% overhead charges=18.69 Total=475.72 |
| 4 | Supplying and laying(properly as per design and drawing)rip rap with good quality of boulder duly packed including the cost of materials,royalty all taxes but excluding the cost of carriage all..do…do….E/I |
| 5 | Providing and laying in position cement concrete of grade M20 in nominal mix of 1:1.5:3 in foundation with approved quality of stone chips 20mm to 6mm size …do…do…E/I |
| 6 | Filling in foundation trenches and plinth in layers not exceeding 150mm thick well watered,rammed,fully compacted and fine dressed with earth obtained after cutting within a lead of 50m and lift 1.5m all…do…do….E/I |
| 7 | Centering and shuttering including strutting propping etc and removal of form for all…do…do…E/I |
| 8 | Add carriage cost of Materials i) Sand lead 45 km |
| 9 | Chips lead 16 km |
| 10 | dust lead 16 km |
| 11 | Boulder lead 16 km |
| 12 | Cement lead 12 km |
| 13 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) |
| 14 | Providing and laying of dry rubble flooring complete as per drawing and technical specifications clause 1303.3 |
| 15 | Providing plain/reinforced concrete in open foundation complete as per drawing and tehnical specifications (P.C.C. grade M- 15) |
| 16 | Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications clause 702,704,1202,1203 Square Rubble coursed Rubble masonry (1st sort) in cm (1:3) |
| 17 | Stone masonry work in cement mortar in substructure complete as per drawing and technical specifications clause 702,704,1202,1203 course Rubble masonry in cm (1:3) in substructure S.O.R. Item No. 13.4 B |
| 18 | Plain/Reinforced cement concrete in sub- structure complete as per drawing and technical specifications (P.C.C. Grade M-15) S.O.R. Item No.13.5A(p) |
| 19 | Plain/reinforced cement concrete in sub structure complete as per drawing and technical specifications (P.C.C. Grade M-20) S.O.R. Item No. 13.5B(p |
| 20 | Plain/reinforced cement concrete in sub structure complete as per drawing and technical specifications (P.C.C. Grade M-25 in Deck Slab) S.O.R. Item No. 13.5 F (p) Case I |
| 21 | Providing and Laying cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and technical specifications |
| 22 | Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications S.O.R. Item No. 13.6 |
| 23 | Plastering with cement (1:3) 15 mm thick on brick or stone masonry work in substructure as per technical specifications Clauses 613.481204 S.O.R. ITEM No. 13.3 |
| 24 | Providing weepholes in brick /stone masonry, Plain/Reinforced concret abutment, wing wall, Return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specifications Clauses 614,709,1204.3.7 S.O.R. Item No. 13.8 |
| 25 | Backfilling behind Abutment, wing wall and return wall with sandy material complete as per drawing and technical specifications Clause 1204.3.8 |
| 26 | Add carriage cost of Materials i) Sand lead 45 km |
| 27 | Chips lead 16 km |
| 28 | dust lead 16 km |
| 29 | Boulder lead 16 km |
| 30 | Cement lead 12 km |
| 31 | Add 18 % GST |
| 32 | Add cost of S/b and Photo graphy |
| 33 | add 1 % labour cess Please Enable Macros to View BoQ information |