|
| 1 | Clearing and Grubbing Road land (Clearing and Grubbing Road land including uprroting rank vegetation, grass, bushes, shrubs, sapling and trees grith up to 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials to be used or auctioned up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness |
| 2 | Granular Sub base with coarse graded material (Table 400-2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place mithoe with rotavatory at OMC, and compacting with vibratory roller to achieve the desire density, complete as per clause 401) for Grading-ii Material. |
| 3 | Providing RCC/PCC M 20 in nominal mix (1:1.5:3) in Foundation with approved quality of stone chips 20mm to 6mm size graded and clean course sancl of F.M 2.5 to 3 including screening, Mixing cement concrete in mixer and placing in position vibrating, striking, curing, taxes and royalty all complete as per specification and direction Engineer-in-charge |
| 4 | Filling in foundation trenches and pinth in layers not exceeding 150mm tick well watered, rammed, fully compacted and fine cressed with earth obtained from excavation foundation treches within a alead of 50M and lift of 1.5 mm. All complete as per building dpecification and direction of E/I (Mode of measurement compacted volume). (Final Filling) |
| 5 | Providing shuttering including stretting propinng etc and its removal after use in foundation as per …do…do |
| 6 | Excavation in soil by Manual means. (Excavation for roadway in soil using manual means including loading truck for carrying of cut earth to embankment site with all |
| 7 | Providing course clean sand in filling in foundation trenches or in plinth including ramming and watering in layer not exceeding 75mm tick with all leads and lifts including cost of all materials labour rayality and taxes all complete as per building specification and direction of E/I |
| 8 | Providing and laing cement concrete M15 (1:2:4) on foundation….do….as per E/I |
| 9 | Providing R/R stone masonry (1:4) in foundation……do………do E/I |
| 10 | Providing R/R stone masonry (1:4) in super- structure foundation……do………do E/I |
| 11 | Providing and laying cement concrete (1:1.5:3) M20 in foundation |
| 12 | Providing aweep holes with dry graded stone filter…..do……..do E/I |
| 13 | Providing centering and shuttering including proping etc in undation….do….do E/I |
| 14 | Providing tuck pointing (1:3) in stone masonary work….do….do E/I |
| 15 | E/W in filling in foundation trenches or back filling….do……do E/I |
| 16 | Carriage of Materiali) Cement from 10 km |
| 17 | ii) Sand lead 2+65km |
| 18 | iii) Stone chips 2+15km |
| 19 | iv) Earth lead 1 km |
| 20 | v) Dust (Aggregate for GSB) 2+15km |
| 21 | Vi) Boulder |
| 22 | Good and Services Taxes @ 18% |
| 23 | Labour Cess @ 1% Please Enable Macros to View BoQ information |