| 1 | ITEM DESCRIPTION / HEADLING |
| 2 | (A) DIVERSION OF KP1 & KP2 FEEDER 6.6KV OVER HEAD LINE FROM CISF INSPECTOR BUNGLOW NEAR SIJUA POST OFFICE TO SIJUA CHURCH NEAR OLD KATRAS AREA OFFICE OF AKWMC OCP :- TRANSPORATION OF POLE |
| 3 | ERECTION OF RAIL POLE OF (ABOVE 10 MTR.LENGTH) IN CEMENT CONCRETE 1:3:6(1 CEMENT:3 COARSE SAND : GRANDED STONE AGGREGATE 40MM NOMINAL) FOUNDATION INCLUDING EXCAVATION AND REFILLIGETC AS REQUIRED. |
| 4 | SUPPLYING OF CHANNEL IRON 75 MM X 40 MM X 6 MM(7.14 KG PER MTR) CROSS ARM FOR TWO 11KV OVER HEAD LINE CONDUCTORS COMPLETE WITH 50MMX 50MMX6 MM (ANGLE IRON BRACKET WLDED TO THE CHANNEL IRON AND COMPLETE WITH 50 MM X 6 MM M.S FLAT IRON CLAMPS.BOLTS AND NUTS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS,NUTS AND WASHERS ETC (AS PER DRAWING) AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 5 | SUPPLYING OF CHANNEL IRON 75MMX40MMX06MM(7.14 KG.PER MTR) POLE TOP BRACKET/CROSS ARM FOR SINGLE 11 KV OVER HEAD LINE CONDUCTOR COMPLETE WITH 50 MM X 6MM FLATE IRON CLAMP,BOLTS,NUTS AND WASHERS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS AND NUTS ETC.AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 6 | SUPPLYING OF TWO LENGTH CHANNEL IRON 75MMX40MMX06MM(7.14 KG PER MTR) DOUBLE POLE CROSS ARM FOR THREE WIRE 11KV OVER HEAD LINE CONDUCTORS COMPLETE WITH THROUGH BOLTS AND NUTS FOR CLAMPING TO THE POLES.50 MMX 6 MM M.S FLATS WELDED ON ONE SIDE TO THE CHANNEL IRON AND WITH BOLTS AND NUTS ON THE OTHER SIDE FOR TYING THE CROSS ARMS TOGETHER,INCLUDING DRILLING HOHES FOR INSULATOR PINS/FITTINGS,NUTS AND WASHERS ETC.(AS PER DRAWING) AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 7 | ERECTION OF POLE TOP/STRAIGHT TWO WIRE/ V SHAPE TWO WIRE,ANGLE IRON/CHANNEL IRON,CROSS ARM |
| 8 | ERECTION OF DOUBLE POLE 3 WIRE CROSS ARM FOR 6.6KV. |
| 9 | SUPPLYING AND ERECTION OF A SET OF CROSS BRACING FRAME WORK FOR 11 KV OVER HEAD LINE DOUBLE POLE STRUCTURE HAVING FOUR MEMBERS FABRICATED OUT OF 50 MMX 50MM X6 MM ANGLE IRON TO FORM A RECTANGLE OF MANIMUM SIZE 1400 MM WIDTH X 2500 MM HEIGHT, COMPLETE WITH 50 MM X 6 MM M.S FLAT IRON CLAMPS,BOLTS AND NUTS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS AND NUTS ETC AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 10 | SUPPLYING AND ERECTION OF 11 KV DISC INSULATOR FOR 11 KV OVER HEAD LINES. |
| 11 | SUPPLYING AND ERECTION OF 11 KV PIN INSULATOR . |
| 12 | SUPPLY AND ERECTION OF STAY SET COMPLETE. |
| 13 | ERECTION OF ACSR WOLF CONDUCTOR OF 7/3.35 MM TO 7/4.00 DIA MTR AND ABOVE INCLUDING ETC. AS REQUIRED.3800 MTR. 9 SPAN X 3X80 MTR. |
| 14 | SUPPLY OF G.I 8 SWG EARTH WIRE/CRADLE GUARD. |
| 15 | ERECTION OF CRADLE GUARD A 7 SPAN. |
| 16 | ERECTION OF GI WIRE 8 NO SWG INCLUDING BINDING. |
| 17 | PROVIDING AND MAKING STEEL POLE COLLAR WITH CEMENT CONCRETE(1 CEMENT ; 3 COARSE SAND ; 6 STONE AGGREGATE 20 MM) OF SPECIFIED SIZE AND SHAPE INCLUDING FORM WORK,PLASTERING IF REQUIRED,CURING ETC AS REQUIRED. |
| 18 | CUTTING OF TREE,TREE BRANCHES AND BUSHES( 8 HEAD X 15 HEAD) |
| 19 | DISMANTLING OF WOLF CONDUCTOR 3000 MTR. |
| 20 | DISMANTLING OF DISC INSULATOR 30 NOS. |
| 21 | DISMANTLING OF PIN INSULATOR 30 NOS. |
| 22 | DISMANTLING OF IRON MATERIALS |
| 23 | DISMANTLING OF POLES. |
| 24 | (B) DIVERSION OF KP1 FEEDER 6.6KV NEAR TCC CHECK POST.:- TRANSPORATION OF POLE. |
| 25 | ERECTION OF RAIL POLE OF (ABOVE 10 MTR LENGTH) IN CEMENT CONCRETE 1:3:6(1 CEMENT : 3 COARSE SAND : GRANDED STONE AGGEGATE 40 MM NOMINAL) FOUNDATION INCLUDING EXCAVATION AND REFILLING ETC AS REQUIRED. |
| 26 | 'SUPPLYING OF CHANNEL IRON 75MMX40MMX06MM(7.14 KG.PER MTR) POLE TOP BRACKET/CROSS ARM FOR SINGLE 11 KV OVER HEAD LINE CONDUCTOR COMPLETE WITH 50 MM X 6MM FLATE IRON CLAMP,BOLTS,NUTS AND WASHERS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS AND NUTS ETC.AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 27 | SUPPLYING OF TWO LENGTH CHANNEL IRON 75MMX40MMX06MM(7.14 KG PER MTR) DOUBLE POLE CROSS ARM FOR THREE WIRE 11KV OVER HEAD LINE CONDUCTORS COMPLETE WITH THROUGH BOLTS AND NUTS FOR CLAMPING TO THE POLES.50 MMX 6 MM M.S FLATS WELDED ON ONE SIDE TO THE CHANNEL IRON AND WITH BOLTS AND NUTS ON THE OTHER SIDE FOR TYING THE CROSS ARMS TOGETHER,INCLUDING DRILLING HOHES FOR INSULATOR PINS/FITTINGS,NUTS AND WASHERS ETC.(AS PER DRAWING) AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 28 | 'ERECTION OF POLE TOP/STRAIGHT TWO WIRE/ V SHAPE TWO WIRE,ANGLE IRON/CHANNEL IRON,CROSS ARM |
| 29 | ERECTION OF DOUBLE POLE 3 WIRE CROSS ARM FOR 6.6KV. |
| 30 | SUPPLYING AND ERECTION OF A SET OF CROSS BRACING FRAME WORK FOR 11 KV OVER HEAD LINE DOUBLE POLE STRUCTURE HAVING FOUR MEMBERS FABRICATED OUT OF 50 MMX 50MM X6 MM ANGLE IRON TO FORM A RECTANGLE OF MANIMUM SIZE 1400 MM WIDTH X 2500 MM HEIGHT, COMPLETE WITH 50 MM X 6 MM M.S FLAT IRON CLAMPS,BOLTS AND NUTS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS AND NUTS ETC AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 31 | 'SUPPLYING AND ERECTION OF 11 KV DISC INSULATOR FOR 11 KV OVER KREAD LINES. |
| 32 | ERECTION OF 11 KV PIN INSULATOR |
| 33 | SUPPLYING AND ERTECTION OF STAY SET COMPLETE |
| 34 | ERECTION OF ACSR DOG CONDUCTOR OF 7/3:35MM TO 7/4.00 DIA MTR AND ABOVE INCLUDING BINDING ETC.AS REQUIRED 900 MTRS.9 SPAN X 3 X 80 MTR. |
| 35 | SUPPLY OF G.I 8 SWG EARTH WIRE/CRADLE GUARD. |
| 36 | ERECTION OF CRADLE GUARD A 7 SPAN. |
| 37 | ERECTION OF GI WIRE 8 NO SWG INCLUDING BINDING. |
| 38 | SUPPLY AND ERECTION OF AB/GOAB SWITCH 11KV 1240 AMPS WITH SUPPLY OF IRON MATERPALS COMPLETE AS REQUIRED. |
| 39 | DISMANTLING OF DOG CONDUCTOR 1050 MTRS. |
| 40 | DISMANTLING OF DISC INSULATOR 6 NOS. |
| 41 | DISMANTLING OF PIN INSULATOR 9 NOS. |
| 42 | DISMANTLING OF POLES. |
| 43 | (C) DIVERSION OF KP1 FEEDER 6.6KV OVER HEAD LINE AT TETULMARI PATCH OF AKWMC OCP :- TRANSPORATION OF POLE |
| 44 | ERECTION OF RAIL POLE OF (ABOVE 10 MTR LENGTH) IN CEMENT CONCRETE 1:3:6(1 CEMENT : 3 COARSE SAND : GRANDED STONE AGGEGATE 40 MM NOMINAL) FOUNDATION INCLUDING EXCAVATION AND REFILLING ETC AS REQUIRED. |
| 45 | SUPPLYING OF CHANNEL IRON 75 MM X 40 MM X 6 MM(7.14 KG PER MTR) CROSS ARM FOR TWO 11KV OVER HEAD LINE CONDUCTORS COMPLETE WITH 50MMX 50MMX6 MM (ANGLE IRON BRACKET WLDED TO THE CHANNEL IRON AND COMPLETE WITH 50 MM X 6 MM M.S FLAT IRON CLAMPS.BOLTS AND NUTS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS,NUTS AND WASHERS ETC (AS PER DRAWING) AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 46 | SUPPLYING OF CHANNEL IRON 75MMX40MMX06MM(7.14 KG.PER MTR) POLE TOP BRACKET/CROSS ARM FOR SINGLE 11 KV OVER HEAD LINE CONDUCTOR COMPLETE WITH 50 MM X 6MM FLATE IRON CLAMP,BOLTS,NUTS AND WASHERS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS AND NUTS ETC.AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 47 | SUPPLYING OF TWO LENGTH CHANNEL IRON 75MMX40MMX06MM(7.14 KG PER MTR) DOUBLE POLE CROSS ARM FOR THREE WIRE 11KV OVER HEAD LINE CONDUCTORS COMPLETE WITH THROUGH BOLTS AND NUTS FOR CLAMPING TO THE POLES.50 MMX 6 MM M.S FLATS WELDED ON ONE SIDE TO THE CHANNEL IRON AND WITH BOLTS AND NUTS ON THE OTHER SIDE FOR TYING THE CROSS ARMS TOGETHER,INCLUDING DRILLING HOHES FOR INSULATOR PINS/FITTINGS,NUTS AND WASHERS ETC.(AS PER DRAWING) AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 48 | ''ERECTION OF POLE TOP/STRAIGHT TWO WIRE/ V SHAPE TWO WIRE,ANGLE IRON/CHANNEL IRON,CROSS ARM |
| 49 | 'ERECTION OF DOUBLE POLE 3 WIRE CROSS ARM FOR 6.6KV. |
| 50 | SUPPLYING AND ERECTION OF A SET OF CROSS BRACING FRAME WORK FOR 11 KV OVER HEAD LINE DOUBLE POLE STRUCTURE HAVING FOUR MEMBERS FABRICATED OUT OF 50 MMX 50MM X6 MM ANGLE IRON TO FORM A RECTANGLE OF MANIMUM SIZE 1400 MM WIDTH X 2500 MM HEIGHT, COMPLETE WITH 50 MM X 6 MM M.S FLAT IRON CLAMPS,BOLTS AND NUTS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS AND NUTS ETC AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 51 | SUPPLYING AND ERECTION OF 11 KV DISC INSULATOR FOR 11 KV OVER HEAD LINES. |
| 52 | SUPPLYING AND ERECTION OF 11 KV PIN INSULATOR . |
| 53 | SUPPLYING AND ERECTION OF STAY SET COMPLETE. |
| 54 | ERECTION OF ACSR WOLF CONDUCTOR OF 7/3.35 MM TO 7/4.00 DIA MTR AND ABOVE INCLUDING ETC. AS REQUIRED.3800 MTR. 9 SPAN X 3X80 MTR. |
| 55 | SUPPLY OF G.I 8 SWG EARTH WIRE/CRADLE GUARD. |
| 56 | ERECTION OF CRADLE GUARD A 7 SPAN. |
| 57 | ERECTION OF GI WIRE 8 NO SWG INCLUDING BINDING. |
| 58 | DISMANTLING OF WOLF CONDUCTOR 3000 MTR. |
| 59 | DISMANTLING OF DISC INSULATOR 30 NOS. |
| 60 | DISMANTLING OF PIN INSULATOR 18 NOS. |
| 61 | DISMANTLING OF IRON MATERIALS |
| 62 | DISMANTLING OF POLE. |
| 63 | (D) DIVERSION OF KP1 FEEDER 6.6KV OVER HEAD LINE AT BACK SIDE OF 4 NO.SUB-STATION TO CHP :- TRANSPORATION OF POLE |
| 64 | ERECTION OF RAIL POLE OF (ABOVE 10 MTR LENGTH) IN CEMENT CONCRETE 1:3:6(1 CEMENT : 3 COARSE SAND : GRANDED STONE AGGEGATE 40 MM NOMINAL) FOUNDATION INCLUDING EXCAVATION AND REFILLING ETC AS REQUIRED. |
| 65 | SUPPLYING OF CHANNEL IRON 75 MM X 40 MM X 6 MM(7.14 KG PER MTR) CROSS ARM FOR TWO 11KV OVER HEAD LINE CONDUCTORS COMPLETE WITH 50MMX 50MMX6 MM (ANGLE IRON BRACKET WLDED TO THE CHANNEL IRON AND COMPLETE WITH 50 MM X 6 MM M.S FLAT IRON CLAMPS.BOLTS AND NUTS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS,NUTS AND WASHERS ETC (AS PER DRAWING) AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 66 | 'SUPPLYING OF CHANNEL IRON 75MMX40MMX06MM(7.14 KG.PER MTR) POLE TOP BRACKET/CROSS ARM FOR SINGLE 11 KV OVER HEAD LINE CONDUCTOR COMPLETE WITH 50 MM X 6MM FLATE IRON CLAMP,BOLTS,NUTS AND WASHERS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS AND NUTS ETC.AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 67 | SUPPLYING OF TWO LENGTH CHANNEL IRON 75MMX40MMX06MM(7.14 KG PER MTR) DOUBLE POLE CROSS ARM FOR THREE WIRE 11KV OVER HEAD LINE CONDUCTORS COMPLETE WITH THROUGH BOLTS AND NUTS FOR CLAMPING TO THE POLES.50 MMX 6 MM M.S FLATS WELDED ON ONE SIDE TO THE CHANNEL IRON AND WITH BOLTS AND NUTS ON THE OTHER SIDE FOR TYING THE CROSS ARMS TOGETHER,INCLUDING DRILLING HOHES FOR INSULATOR PINS/FITTINGS,NUTS AND WASHERS ETC.(AS PER DRAWING) AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 68 | ERECTION OF POLE TOP/STRAGHT TWO WIRE/ V SHAPE TWO WIRE,ANGLE IRON/CHANNEL CROSS ARM. |
| 69 | ERECTION OF DOUBLE POLE 3 WIRE CROSS ARM FOR 6.6 KV. |
| 70 | 'SUPPLYING AND ERECTION OF A SET OF CROSS BRACING FRAME WORK FOR 11 KV OVER HEAD LINE DOUBLE POLE STRUCTURE HAVING FOUR MEMBERS FABRICATED OUT OF 50 MMX 50MM X6 MM ANGLE IRON TO FORM A RECTANGLE OF MANIMUM SIZE 1400 MM WIDTH X 2500 MM HEIGHT, COMPLETE WITH 50 MM X 6 MM M.S FLAT IRON CLAMPS,BOLTS AND NUTS INCLUDING DRILLING HOLES FOR INSULATOR PINS,BOLTS AND NUTS ETC AND PAINTING WITH PRIMER AND FINISH PAINT AS REQUIRED. |
| 71 | 'SUPPLYING AND ERECTION OF 11 KV DISC INSULATOR FOR 11 KV OVER HEAD LINES. |
| 72 | ERECTION OF 11 KV PIN INSULATOR |
| 73 | SUPPLYING AND ERECTION OF STAY SET COMPLETE. |
| 74 | ERECTION OF ACSR WOLF CONDUCTOR OF 7/3.35 MM TO 7/4.00 DIA MTR AND ABOVE INCLUDING ETC. AS REQUIRED.3800 MTR. 9 SPAN X 3X80 MTR. |
| 75 | 'SUPPLY OF G.I 8 SWG EARTH WIRE/CRADLE GUARD. |
| 76 | ERECTION OF CRADLE GUARD A 7 SPAN |
| 77 | ERECTION OF G I WIRE 8 NO SWG INCJUNDING BINDING |
| 78 | DISMANTLING OF WOLF CONDUCTOR 840 MTR. |
| 79 | DISMANTLING OF IRON MATERIALS |
| 80 | DISMANTLING OF POLE. |
| 81 | (E) SUPPLY & ERECTION OF GOAB SWITCH AND 120SQMM CABLE LAYING TO PROVIDE ALTERNATE POWER CONNECTION TO NKAS FEEDER BREAKER SU-STATION FROM KP1 FEEDER 6.6KV OVER HEAD LINE AND DISMANTLING OF ONE SPAN OF AP-2 6.6KV OVER HEAD LINE FROM NKAS FEEDER BREAKER SUB-STATION AT SIJUA SIDING.(1) SUPPLY & ERECTION OF 01 SET OF GOAB SWITCH AND 120 SQ.MM CABLE LAYING TO PROVIDE ALTENATE POWER CONNECTION TO NKAS FEEDER BREAKER SUB-STATION FROM KP-1 FEEDER 6.6KV O/H LINE. :- SUPPLY AND ERECTION OF AB/GOAB SWITCH 11 KV 1240 AMPS WITH SUPPLY OF IRON MATERIALS COMPLETE AS REQUIRED. |
| 82 | 11KV CABLE LAYING UPTO 240 SQ.MM INCLUDING EXCAVATION SAND CUSHIONING PROECTIVE COVERING AND REFILLING. |
| 83 | OUTDOOR CABLE JOINTING WITH HEAT SHRINCABLE 11KV GRADE 240 SQ.MM. |
| 84 | INDOOR CABLE JOINTING WITH SHINCABLE 11KV GRADE 240 SQ.MM. |
| 85 | (2) DISMANTLING OF ONE SPAN OF AP2 FEEDER 6.6 KV OVER HEAD LINE.:- DISMANTLING OF WOLF CONDUCTOR 180 MTRS. |
| 86 | DISMANTLING OF DISC INSULATOR 9 NOS. |
| 87 | DISMANTLING OF PIN INSULATOR 3 NOS. |
| 88 | DISMANTLING OF IRON MATERIALS |
| 89 | DISMANTLING OF POLE |
| 90 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |