| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: EXECUTIVE ENGINEER, CONSTRUCTION DIVISION, PWD B&R BRANCH FEROZEPUR Name of Work: Construction of Boundary Wall of Tehsil Complex Guruharsahai, District Ferozepur Contract No: Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Name Item Code / Make Quantity Unit RateRs. P Addition / Deduction Addition / Deduction Values Currency Conversion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e. DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation |
| 3 | Cement concrete 1:5:10 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type(14.14+7.71=21.85) |
| 4 | Cold twisted deformed (Ribbed/ Tor Steel Bar/TMT) Bars Fe 500 grade as per IS 1786-2008, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete(35.42+14.57+13.76=63.75) |
| 5 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)(92.94+33.74+153.35+139.41=419.44) |
| 6 | Reinforced cement concrete M-20 mechanically mixed using voluemetric type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. |
| 7 | Centering and shuttering for columns (Square or rectangular or poly gonal in plain)(58.74+55.76+116.17=230.67) |
| 8 | Reinforced cement concrete M-20 mechanically mixed using voluemetric type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. (4.47+21.24+4.25+21.24+8.85=60.05) |
| 9 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. |
| 10 | Providing and laying in super structure for first storey factory made with vibro-hydraulic compaction machine precast Hollow block of cement concrete setting in position with cement mortar 1:3 (1 cement:3 course sand ) including cost of hosting, centering and shuttering complete as per IS:2185 (Part-1): 2005. Vibro Hydraulic CC Blocks as/csr 400x200x150 |
| 11 | 12.5mm thick cement plaster 1:5 |
| 12 | Wrought iron & Mild steel ladders, framed grills, gratings etc. with ends of bars rivetted of molded forged framed window guards, barred iron doors stair case iron railing etc. including cost of bolts and nuts, screws, welding rod complete fixing in position |
| 13 | Applying priming coat with metal primer on new steel or iron work including preparation of surface. (b) With ordinary quality Paint |
| 14 | Painting two coats excluding priming coat with ready mixed paint for metallic surfaces in all shades on steel or iron work(b) With ordinary quality Paint Total in Figures 2187128.0 2187128.0 INR Twenty One Lakh Eighty Seven Thousand One Hundred & Twenty Eight Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |