| 1 | ERECTION PART +SUPPLY PART |
| 2 | Erection Part CT/PT Str.TS NO-320/2025-26 WBS -32100261-001-Una-CT-039 |
| 3 | Erection of CT/PT Str . including 2 pole str for GO Switch i.e. Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of CT/PT Unit, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. |
| 4 | Erection Part HT Part.TS NO-321/2025-26 WBS -32100261-001-Una-HT-159 |
| 5 | Erection of ST Single Pole Str. 10 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , and ramming & painting of poles complete in all respect. |
| 6 | Erection of ST Single Pole Str. 11 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , and ramming & painting of poles complete in all respect. |
| 7 | Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect. |
| 8 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. |
| 9 | Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 10 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 11 | Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site |
| 12 | Supply Part CT/PT Str.TS NO-320/2025-26 WBS -32100261-001-Una-CT-039 |
| 13 | Prov. CT-PT Combined Unit [PT:11 kV/110 V) ; CT:10-400/5A] |
| 14 | Prov.3-phase, 3/4-Wire CT-PT operated Static Trivector Meter (DLMS Compliant) |
| 15 | I. Prov. PVC Multistrand 2.5 mm² copper wire |
| 16 | II. Prov. 1 inch dia GI pipe for concealin |
| 17 | III. Prov. bend joints/ elbo |
| 18 | Prov.Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) [Optional- Other types of Poles may be used as per site condition] |
| 19 | Prov.Muffs with concerete filling |
| 20 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 4 Nos] |
| 21 | Prov.X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 22 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of CT-PT Unit] |
| 23 | Prov.Angle Iron (50X50x6 mm), Length: 2800 mm x1 Nos for LA's) |
| 24 | Prov.CT-PT Unit Belting & Knee Bracing |
| 25 | Prov.MS Angle Iron (50X50x6 mm), Length : 2800 mm x 4 Nos |
| 26 | Prov.MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
| 27 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 28 | Prov.GO AB Switch Unit (11kV, 400A, 25 KA ) |
| 29 | Prov.D.O Fuse Unit |
| 30 | Prov.Sarge Arrester, 9 kV Station Class (Porcelain Type) |
| 31 | Prov.Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 32 | Prov.Stay set complete |
| 33 | Prov.Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 34 | Prov.Pipe Earthing Set |
| 35 | Prov GI Wire 6 SWG For Earthing |
| 36 | Prov.Half Clamp (M.S. Flat 50X6 mm) |
| 37 | Prov.Full Clamps (M.S. Flat 50X6 mm) |
| 38 | Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 39 | Prov.Aluminium Thimble |
| 40 | Prov.Aluminium Thimble (Copper) |
| 41 | Prov.Danger Plate |
| 42 | Prov.Barbed Wire |
| 43 | Prov.Red Oxide |
| 44 | Prov.Auminium Paint. |
| 45 | SUPPLY PART. HT Part.TS NO-321/2025-26 WBS -32100261-001-Una-HT-159 |
| 46 | Prov. ST Pole 10 mtr long with cap. (Provided By HPSEBL) |
| 47 | Prov. ST Pole 11 mtr long with cap. (Provided By HPSEBL) |
| 48 | Prov. RCC Muff |
| 49 | Prov.AAAC 7/4.26 mm Conductor (Provided By HPSEBL)(1.333-.780)=0.553 KM |
| 50 | Prov.G.I.Wire No. 8 SWG in mtr. (Provided By HPSEBL) |
| 51 | Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm |
| 52 | Prov. Angle Iron (50x50x6mm) Leggth 750 mmx2 |
| 53 | Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm |
| 54 | For LT Line D Circuit centilever Channel Iron (75x40x5) [Length- 1.50 Mtr + 0.2 Mtr] |
| 55 | Shackle Insulator (16 kN)+ D-Iron (U- Clamps) with nut and bolts |
| 56 | Prov.Nuts and Bolts of Various Sizes |
| 57 | Prov.MS Half Clamp (Provided By HPSEBL) |
| 58 | Prov.MS Full Clamp |
| 59 | Prov.Barbed Wire |
| 60 | Prov.Eye/Earth Hook |
| 61 | Prov.11kv Pin Insulator with pin complete in all respect |
| 62 | Prov.11kv Stay Set |
| 63 | Prov. Stay Wire (7/3.15 mm) (10 kg. per Stay Set) |
| 64 | Prov.11kv Earthing set complete in all respect. |
| 65 | Prov.Red Oxide (1.5 Ltr. Per Pole) |
| 66 | Prov.Alluminum Paint |
| 67 | Prov.11kv Danger Plate (250x200x1.6 mm) Please Enable Macros to View BoQ information |