|
| 1 | Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting hard or soft rock by chiseling where the blasting work is prohibited slushy daldal and saturated soil I /c pumping or bailing out water with in all heights, stacking the excavated soil with in 15cm (Fifteen centimeters) when required in to plinths, sides of foundation consolidating each deposited layer by ramming and atering and then disposing of all surplus excavated earth as direction with in all leads and lifts as directed by the Engineer-in-Charge. |
| 2 | Providing and laying cement concrete 1:3:6( 1cement:3 sand: 6 graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth. |
| 3 | P/L CEMENT CONCRETE 1:4:8 (1CEMENT:4 SAND:8 GRADED STONE AGGREGATE 40 mm NOMINAL SIZE) and CURING COMPLETE IN FOUNDATION & PLINTH. with in all leads and lifts as per the directed of the Engineer-in-Charge. |
| 4 | Vitrified tiles mat finish FLOORING 20 mm (AVERAGE) THICK BASE OF CEMENT MORTOR 1:4 (ICEMENT:4 SAND) LAID OVER and JOINTED WITH GREY CEMENT SLURRY MIXED WIH PIGMENT TO MATCH THE SHADE OF THE SLAB, 6mm thick with in all leads and lifts as per the directed of the Engineer-in-Charge. |
| 5 | Full body tiles mat finish FLOORING 20 mm (AVERAGE) THICK BASE OF CEMENT MORTOR 1:4 (ICEMENT:4 SAND) LAID OVER and JOINTED WITH GREY CEMENT SLURRY MIXED WIH PIGMENT TO MATCH THE SHADE OF THE SLAB, 6mm thick with in all leads and lifts as per the directed of the Engineer-in-Charge. |
| 6 | Steel work welded in built up section ,trusses and Framed Work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint with in all leads and lifts as per the directed of the Engineer-in-Charge. |
| 7 | APPLYING A PRIMING COAT OVER NEW STEEL and OTHER METALLED SURFACES and I/C PREPARING THE SURFACE BY THOROUGHLY CLEANING OIL,GREASE &DURT and OTHER FOREIGN MATTER SCOURED WITH WIRE BRUSHES FINE STEEL WOOL SRAPERS and SAND PAPER COMPLETE.( WITH READY MIXED PRIMING PAINT BRUSHING RED LEAD,RED-OXIDE/ZINC OXIDE CHROME) |
| 8 | PAINTING TWO COATS (E/C PRIMING COAT) OVER NEW STEEL and OTHER METAL SURFACES WITH READY MIXED PAINT TO GIVE AN EVEN SHADE I/C CLEANING THE OTHER FOREIGN MATTER SAND PAPERING and STOPPING ( PAINT OTHER THAN WHITE) with in all leads and lifts as per the direction of Engineer in Charge. |
| 9 | BRICK WORK USING COMMON BURNT CLAY BUILDING BRICKS(IInd CLASS) IN FOUND. and PLINTH IN 1:6 (1CEMENT:6 SAND) IN FOUNATION and PLINTH.with in all leads and lifts as per the directed of the Engineer-in-Charge. |
| 10 | 20 mm THICK CEMENT PLASTER IN SINGLE COAT ON ROUGH SIDE OF BRICK/STONE MAONRY FOR INTERIOR PLASTERING 1:3 (1CEMENT:3 SAND) with in all leads and lifts as per the directed of the Engineer-in-Charge. |
| 11 | Providing and fixing of Electricity fitting wire 2.5mm anchor (90 Rmt roll ) 1 No, wire 1.5mm anchor 1 no, cassing pvc rounded 32x16 5 nos, Garden light 2 no, double side garden light 3 nos, 100Watt flood light 1 nos, 50W Flood light 1 nos, switch 6 Amp 10 Nos , socket 6amp 4 nos power set 1 no, led tube set 4 nos, switch board 6amp 2 nos switch board 12amp 1 nos as direction with in all leads and lifts as directed by the Engineer-in-Charge. |
| 12 | Providing and fixing of Sanitary fitting GI union 15mm 4 no, GI Elbow 20 Nbos, GI tee 15mm 2 Nos, GI tap 15mm 10 nos, toilet seat 1 nos, angle valve 1 no, waste pipe 1 nos, CPVC pipe 20mm 10 nos, Elbow 20mm 30 Nos Tee 20mm 15 Nos, Tee 20x 15mm 4 No, Elbow 20x15 mm 15 Nos, Socket 20mm 10 nos, GI Nipple 6 No, Angle cock jaquar 6 Nos, consealed body 1 no, Urinal 1 Nos, wash basion 1 No, single inner mixure 1 no, Looking Miror 1 Nos, PVC pipe 75mm dia 6 kg pr. 3 nos, Bath set 1 no with in all leads and lifts as per the directed of the Engineer-in-Charge. Please Enable Macros to View BoQ information |