| 1 | HT Line (Supply Part):- |
| 2 | Supply of 10.00 Mtr. Long ISI marked swaged steel tubular pole as per IS: 2713/1980 (Part-'A') as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-47 (Poles shall be supplied by the HPSEBL = 8 No.) |
| 3 | Supply of RCC pipe (Muff) ISI marked suitable for different sizes of steel poles. 2000 mm in length and 25 mm thick with 250 mm internal dia duly fabricated by using un-galvanized MS wires of 12 SWG rings and 6 mm MS round in vertical direction conforming to ISI 458-1988 or latest version if any |
| 4 | Supply of 11KV HT XLPE Cable 3x120 mm2 (XLPE cable shall be supplied by the HPSEBL = 853 mtr) |
| 5 | Supply of End Termination Kit for HT XLPE Cable 3x120 mm2 |
| 6 | Supply of Steel Rope of suitable size for holding of XLPE Cable 3x120 mm2 alongwith clamps and allied material |
| 7 | Supply of MS Channel 100x50x6 mm Cross Arm: Fabrication and supply of Cross arms suitable for 11 KV made of only TATA/SAIL/RASHTRIYA ISPAT M.S. Channel Iron 100x50x6 mm Cross Arm, suitable for fixing on both Steel and PCC Poles whatever is required single/double pole structure of 11KV line with holes at suitable places wherever required to adjust 5/8” dia nuts and bolts, pin insulators, ball cleaves, eye socket and washers. The weight of MS channel should be strictly 9.56 Kg per meter with a variation of +/-5%. The Cross Arm should be duly painted with two coat red oxide paint of superior quality: |
| 8 | 600 mm long |
| 9 | Supply of Knee bracing set 1100mm (65x65x6) mm |
| 10 | Supply of HT Stay Set complete including, Guy Assembly, Helically fitting & stay wire @ 10.00 kg per stay set (Supply of Galvanized Stay Strand conforming to ISS-2141/1992 Edition 2002-05 (with upto date amendments) with heavy coating Zinc hot Dip Galvanized as per ISS-4826/1979 (2001-06) (latest)of following grade and size:- Grade -4 Size 7/3.15mm (7/10SWG) (HT Stay Set &Stay Wire shall be supplied by HPSEBL, Qty =8 set ) |
| 11 | Supply of 11 kV Pin Insulator Brown Glazed Porcelain insulator alongwith GI Pin confirming to IS-731/1971 or latest version thereof with minimum and maximum creepage distance & duly fitted with lead/zinc thimble suitable for use with GI forged pin having small steel head as per IS:2486 (Part-I & II) of 1993 & latest amendment if any. Moderately polluted atmospheres Creepage distance- 320mm |
| 12 | Supply of Earthing set suitable for HT line/Earthing of metering unit made of GI pipe 40 mm dia (internal dia) wall thickness 3.25 mm medium quality pipe of standard make conforming to IS: specifications 2500 mm long with GI Socket closed at top pipe shall have holes of 12 mm dia every 150 mm apart throughout the length and staggered diameterically. Full clamps of MS Flat 40x3 mm fitted at top end of the pipe along with bolts and nuts size 50x12 mm and washers for fixing the clamp on the pipe. The bottom end of the pipe shall be tapered cut at 45 degree. |
| 13 | Supply of Danger Plate Size: 250x200x1.6 mm made of mild steel plates 1.6 (minimum) thick vitreous enameled white letter figure, conventional skill and X-Boxes and signal red colour on front side for use in HPSEBL. The rear side of the plate shall be black enameled and conforming to IS specifiction no. IS-1351/1982 suitable for 11KV |
| 14 | Supply of M.S. Hexagon Bolts and Nuts with washers conforming to ISI-1363-1992 off size |
| 15 | Supply of Galvanised steel barbed wire of 9.8 kg /100metre |
| 16 | Supply of Half Clamp (MS Flat 50x6mm) |
| 17 | Supply of Full Clamp (MS Flat 50x6mm) |
| 18 | Supply of Red Oxide |
| 19 | Supply of Aluminium Paint for all poles and steel fitting |
| 20 | 11KV HT Line (Erection Part):- |
| 21 | Erection charges |
| 22 | Erection of steel tubular pole (Single pole ) digging of pit, Drilling of holes in X-arm, Erection of pole, Fixing of insulator X-arm, Fixing of barbed wire danger plate , Concreting of RCC Muff, Filling of pit+ramming, painting of pole and all steel items (Punching of the poles is stricitly not allowed) |
| 23 | Erection of 11KV HT XLPE Cable 3x120 mm2 a/w steel rope & allied material |
| 24 | Erection of End Termination Kit |
| 25 | Erection of Earthing set (Digging of pit, fixing of GI wire to the earth system & filling of pit) |
| 26 | Erection of Stay Set HT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tighting) |
| 27 | Dismantlement of steel tubular pole (single pole) |
| 28 | Dismantlement of PCC pole (single pole) |
| 29 | Dismantlement of existing 11KV HT AB cable 3x70+70 mm2 i.e. removal, destringing and rolling of cable Please Enable Macros to View BoQ information |