| 1 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR/251 (A)/4.1.1) |
| 2 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. (DSR-18/16.1) |
| 3 | Supplying and stacking at site. (DSR-18/16.3) |
| 4 | 90mm to 45 mm size stone aggregate (DSR-18/16.3.1) |
| 5 | 63mm to 45 mm size stone aggregate (DSR-18/16.3.2) |
| 6 | 53mm to 22.40 mm size stone aggregate (DSR-18/16.3.3) |
| 7 | Supplying and stacking at site.: Moorum. (DSR-18/16.3.10) |
| 8 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road/vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density . (DSR-18/16.4) |
| 9 | Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres. |
| 10 | With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 (DSR-18/16.7.1) |
| 11 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (MORTH 502/5.01/A(i)) |
| 12 | Providing and applying tack coat with bitumen grade of VG-10 using pressure distributor at the rate of 0.25 Kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (MORTH 5.02/503) |
| 13 | Providing and laying dense graded bituminous macadam with Higher capacity batch type HMP using crushed aggregates of specified grading Premixed with bituminous binder VG-30 @4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve to desired compaction as per MoRT & H Specification CLAUSE No 505 complete in all respects (Morth/5.04/505(B)) |
| 14 | 40mm compacted thickness with bitumen peretration of [email protected]% by weight of total mix. (MORTH-/5.05/505(B)) |
| 15 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder [email protected]% of mix and filler transporting the hot mix to work site laying with hydrostatic paver finsher with sensor control to the required grade, level and alignment rolling with smooth, wheeled, vibrator and tendom roller to achieve the desired compaction as per MORTH specification clause 507 complete in all respect (MORTH/507(B)/5.05) |
| 16 | 30mm compacted thickness with bitumen peretration of [email protected]% by weight of total mix |
| 17 | Labour cess and GST will be paid extra as per Govt. orders. Please Enable Macros to View BoQ information |