| 1 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. B.C.D. S.O.R Item No 5.10.3 |
| 2 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. B.C.D. S.O.R Item No 5.10.1 |
| 3 | E/W in excavation in foundation trenches in hard soil (vide classification of soil item - A+B ) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundtion trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I B.C.D.S.O.R No 5.1.1 |
| 4 | Providing sand filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all load and lifts including cost of all materials, labours, royelty and taxes all complete as per building specification & direction of E/I B.C.D.S.O.R No 5.1.10 |
| 5 | Providing Class 75B brick flat soling joint filled with local sandincluding cost of watering taxes, royelty all complete as per building specification and direction of E/I B.C.D.S.O.R No 5.6.3 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size. B.C.D.S.O.R No 5.3.9.1 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of from for - Foundations,footings, bases of columns etc for mass concrete B.C.D.S.O.R No 5.3.17.1 |
| 8 | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL) B.C.D.S.O.R No 5.5.4 |
| 9 | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. (a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL) } B.C.D.S.O.R No 5.5.5 (a) |
| 10 | Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I.(i) Cement |
| 11 | Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I. (ii) Sand |
| 12 | Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I.(iii) Stone Chips |
| 13 | Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I. (iv) Steel |
| 14 | Carriage of materials including loading, unloading, stacking -do- -do- all complete job as per specification and direction of E/I (v).Bricks |
| 15 | Add G.S.T ( Goods & Services Taxes ) 18% |
| 16 | Add Labour Cess 1% Please Enable Macros to View BoQ information |