| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work. |
| 2 | Sub Base Course - Granular Sub-Base with close Graded Material (Table:- 400-1) Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.) |
| 3 | Base Course - Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) |
| 4 | Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing ) |
| 5 | Excavation for strucutres (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) |
| 6 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) |
| 7 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications. M-20 |
| 8 | Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. M-20 |
| 9 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications. |
| 10 | Brick masonry work in 1:3 in substructure complete excluding pointing and plastering, as per drawing and Technical Specifications. Parapet Wall |
| 11 | Plastering with cement mortar (1:3) on brick work in substructure as per technical specifications |
| 12 | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces |
| 13 | Drain Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 14 | Providing Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 15 | Providing R.C.C. M-20 in substructure with crushed stone aggregate 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days. |
| 16 | Providing R.C.C. M-25 in superstructure with crushed stone aggregate 40mm nominal size mechanically mixed placed in foundation and compacted by vibration including curing for 14 days. |
| 17 | Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications. |
| 18 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) |
| 19 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.) |
| 20 | Carriage of material. Brick Lead - 6 Km |
| 21 | Cement Lead - 10 Km |
| 22 | Sand Lead - 25 Km |
| 23 | Stone Chips Lead - 20 Km |
| 24 | Steel Lead - 10 Km |
| 25 | GST@18% |
| 26 | Labour Cess@1% Please Enable Macros to View BoQ information |