| 1 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete |
| 2 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out |
| 3 | Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete |
| 4 | Km 0/0 - 1/0 |
| 5 | Km 1/0 - 2/00 |
| 6 | Km 2/0-3/0 |
| 7 | Km 3/0-4/0 |
| 8 | Km 4/0- 4/5 |
| 9 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete |
| 10 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 11 | Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. |
| 12 | Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. |
| 13 | Providing and Laying Bituminous Macadam 50mm thick based on job micx formula mixes in job mix plant of drum type in one layer for overlay as shown in drawing using paving bitumen 60/70 penetration grade as per IS 73 and aggregate confirming to grading.. |
| 14 | Providing and laying Bituminious concrete to 30 mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 |
| 15 | Provision for Hectometer stone |
| 16 | Provision for Kilometer stone |
| 17 | Provision for Citizen Information Board |
| 18 | Calculation of SubTotal, GST and Total carried out by system automatically |
| 19 | Sub Total Amount for above all items |
| 20 | GST 18% for the above SubTotal Amount Please Enable Macros to View BoQ information |
| 21 | GST 18% for the above SubTotal Amount Please Enable Macros to View BoQ information |