| 1 | Construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 meter transporting to sites spreading grading to require slope and compaction to meet requirement of table 300.1 & 300.2 with a lead up to 1000 meter as per MORD technical specification clause 301.5 MORD sepecification 301.5(i) S.No. 3.4 (Ordinary soil) |
| 2 | Construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete. |
| 3 | Construction of Granular sub base by providing well graded material, spreading in uniform layer with motor grader on prepared surface mixing by mix in place method with 2% Cement (OPC) with rotavator at OMC and compacting with smooth wheel roller to achive the desired density complete as per clause 401. |
| 4 | Cement Treated Base Providing , laying, spreading material on a prepared sub grade adding cement @ 4% by weight of the spread material manually mixing in place with rotavator and compacting with the road roller at OMC to achive the desired unconfined strength and to form a layer of sub base. |
| 5 | Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503. |
| 6 | Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Technical sepecification Claues 508 |
| 7 | Providing and laying seal coat by manual means with VG-10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type-C As per Technical Specification Clause 510 |
| 8 | Construction of subgrade with approved material obtained from borrow pits with all lifts and leads. transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead up to 1000 m as per Technical specification cause 303.1. including Stablization with 2% slaked lime including its mixing with rotabator complete. (Patri) |
| 9 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. |
| 10 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. |
| 11 | Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 |
| 12 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 |
| 13 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications clauses 600,1200 & 1203 |
| 14 | Plastering with cement mortar (1:4) mm thick on brick work in substructure as per techinical specification clauses 613.4 & 1204 |
| 15 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. (350 mm dai) |
| 16 | Providing and PCC M20 architectural coping on the top of wing wall,return wall etc. complete as per drawing and technical specification clauses 615,710 and 1204.3.11 |
| 17 | Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 1st year (@0 % of total work amount S.No.1-16) per KM. |
| 18 | Maintenance Charge including @ Earth work ,repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 2nd year (@1.00 % of total work amount S.No.1-16) per KM. |
| 19 | Maintenance Charge including @ Earth work , repair of painted surface, earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 3rd year (@1.50% of total work amount S.No.1-16) per KM. |
| 20 | Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 4th year(@2.00% of total work amount S.No.1-16) per KM. |
| 21 | Maintenance Charge including @ Earth work ,repair of painted surface,earthwork on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 5th year (@3.00% of total work amount S.No.1-16) per KM. Please Enable Macros to View BoQ information |