| Sl. No. | Item Description |
| 1 | Bidasar to Ghantiyal Km 0/0 to 5/0 |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 3 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 4 | Dressing of berms including digging of earth upto 10 cm depth. |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 6 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 7 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 8 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 9 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 10 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 11 | Gopalpura to Dunkar Via Hemasar Athuna Balera Km 0/0 to 14/300 |
| 12 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 13 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 14 | Dressing of berms including digging of earth upto 10 cm depth. |
| 15 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 16 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 17 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 18 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 19 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 20 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 21 | A/R to Soorwas Km 0/0 to 2/300 |
| 22 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 23 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 24 | Dressing of berms including digging of earth upto 10 cm depth. |
| 25 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 26 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 27 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 28 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 29 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 30 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 31 | Sarothiya to Luhara Km 0/0 to 6/900 |
| 32 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 33 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 34 | Dressing of berms including digging of earth upto 10 cm depth. |
| 35 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 36 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 37 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 38 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 39 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 40 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 41 | Bhompura to Mela Ground Via Main Road Km 0/0 to 2/0 |
| 42 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 43 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 44 | Dressing of berms including digging of earth upto 10 cm depth. |
| 45 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 46 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 47 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 48 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 49 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 50 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 51 | Balera to Rupeli Km 0/0 to 1/500 |
| 52 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 53 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 54 | Dressing of berms including digging of earth upto 10 cm depth. |
| 55 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 56 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 57 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 58 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 59 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 60 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 61 | Ganora to Kodasar Via Bidawatan Via Charla Kodasar Jatan Km 0/0 to 11/500 |
| 62 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 63 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 64 | Dressing of berms including digging of earth upto 10 cm depth. |
| 65 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 66 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 67 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 68 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 69 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 70 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 71 | Ramnagar to Durgana to Kodasar Bidwatan Km 0/0 to 1/0 |
| 72 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 73 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 74 | Dressing of berms including digging of earth upto 10 cm depth. |
| 75 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 76 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 77 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 78 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 79 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 80 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 81 | Constt of Road from District Boarder Nagur to NH 65 Via Valodiya Basti Km 0/0 to 1/500 |
| 82 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 83 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 84 | Dressing of berms including digging of earth upto 10 cm depth. |
| 85 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 86 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 87 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 88 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 89 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 90 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 91 | Charla to Bhompura Km 0/0 to 13/640 |
| 92 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 93 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 94 | Dressing of berms including digging of earth upto 10 cm depth. |
| 95 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 96 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 97 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 98 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 99 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 100 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 101 | A/R to Sandwa Km 0/0 to 1/0 |
| 102 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 103 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 104 | Dressing of berms including digging of earth upto 10 cm depth. |
| 105 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 106 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 107 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 108 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 109 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 110 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 111 | A/R Bamboo Km 0/0 to 1/0 |
| 112 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 113 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 114 | Dressing of berms including digging of earth upto 10 cm depth. |
| 115 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 116 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 117 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 118 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 119 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 120 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 121 | Rupeli to Chadwas Km 0/0 to 2/050 |
| 122 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 123 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 124 | Dressing of berms including digging of earth upto 10 cm depth. |
| 125 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 126 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 127 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 128 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 129 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 130 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 131 | Main Road to Luhara Rasta to Parewada Rasta Udawala Km 0/0 to 1/0 |
| 132 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 133 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 134 | Dressing of berms including digging of earth upto 10 cm depth. |
| 135 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 136 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 137 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 138 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 139 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 140 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 141 | Atal Seva Center Huntaram Bawari house Via Deva Ram Manda Channa Ram Sihag Sohan Ji Manda Jiva Ram Manda Balera Km 0/0 to 0/970 |
| 142 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 143 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 144 | Dressing of berms including digging of earth upto 10 cm depth. |
| 145 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 146 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 147 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 148 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 149 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 150 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 151 | Balera to Rupeli Km 0/0 to 1/500 |
| 152 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 153 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 154 | Dressing of berms including digging of earth upto 10 cm depth. |
| 155 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 156 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 157 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 158 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 159 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 160 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. |
| 161 | Approach Road to Khoti Nada Km 0/0 to 3/0 |
| 162 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of thorny jungle |
| 163 | Restoration of rain cuts with soil, moorum gravel or a mixture of these, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRTH specifications Clause 3002 Mechanical Means |
| 164 | Dressing of berms including digging of earth upto 10 cm depth. |
| 165 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material |
| 166 | Maintenance of WBM road including filling up of pot holes, ruts and rectifying corrugated surface, damaged edges and ravelling as per MoRTH specification Clause 404 |
| 167 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat, 13mm thick pre-mix carpet and seal coat type B as per MoRTH specification Clause 3004.2 |
| 168 | Supply of readymade cold bituminous mixture for pothole patching in potholes in accordance with IRC:116-2014 specifications with IRC: 116-2014 spccifications with 5.6% MC-800 Cut back Bitumen and suitable anti stripping agent with all lead and lift in 50 kg plastic lined sturdy bags complete in all respect as per direction of engincer-in- charge including all transportation, stacking & taxes etc |
| 169 | Placing and compacting readymade cold bituminous mixture in potholes duly prepared in accordance with IRC:116-2014 with Specifications with all lead and lift for placement at site complete in all respect as per Direction of Engineer-in-charge including all taxes etc. |
| 170 | Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete. Please Enable Macros to View BoQ information |