| 1 | APPENDIX 1- KULAPPARA WSS |
| 2 | 15.3Demolishing R.C.C. work manually / by mechanical means including stacking ofsteel bars and disposal of unserviceable material with in 50 metres lead as perdirection of Engineer -in-Charge. |
| 3 | 14.83Hacking of CC flooring including cleaning for surface etc. complete as per directionof the Engineer-in-Charge. |
| 4 | 5.1.2Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mmnominal size derived from natural sources) |
| 5 | 5.22.6Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelThermo - Mechanically Treatedbars of grade Fe-500D or more |
| 6 | 5.9.2Centering and shuttering including strutting, etc. and removal of form for:Walls (anythickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 7 | 13.35.1Pointing on stone slab ceiling with cement mortar 1:2 ( 1 cement : 2 fine sand):Flush /Ruled pointing |
| 8 | 13.1.112 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |
| 9 | 13.7.112 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1cement : 3 fine sand) |
| 10 | 13.60.1Wall painting with acrylic emulsion paint of approved brand and manufacture to givean even shade:Two or more coats on new work |
| 11 | 10.25.1Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer usingstructural steel etc. as required.In stringers, treads,landings etc. of stair cases,including use of chequered plate wherever required, all complete |
| 12 | 13.52.1Finishing with Epoxy paint (two or more coats) at all locations prepared and appliedas per manufacturer's specifications including appropriate priming coat,preparation of surface, etc. complete.On steel work |
| 13 | 100.98.172Supply of HDPE Pipe PE 100 (IS 4984/1995), 12.5kg, 63mm Outer Dia. |
| 14 | Laying HDPE pipes (IS : 4984) on land portion including conveying within initiallead and aligning the pipes, electro-fusion welding using automatic or semi-automaticelectrofusion machines, testing the pipeline thus fabricated to suit the hydraulicworking pressure and after testing, aligning the pipeline, lowering the pipe in positioninto the trenches already made, testing the line to suitable pressure with potable waterbefore back filling and levelling the trenches including all labour charge, hire forappliances etc., complete but excluding cost of pipe and fittings: 90mm NominalOuter Diameter pipes. |
| 15 | 100.59.1Cutting the bituminous / concrete roads with cutting machine for a minimum depth of200mm along the sides of proposed alignment of the pipe to be laid without causingany damage to other utilities, including the charges for hire and conveyance of toolsand plant, cost of consumables and charges for lighting, watching, ribbon fencing,caution boards, traffic diversion, and as per the direction of departmental officers etc.complete, before carrying out the demolition of bituminous / concrete road bymechanical means and carrying out the excavation. |
| 16 | 100.1.1Excavating trenches of required width for pipes, cables, etc., including excavation forsockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, includinggetting out the excavated soil, and then returning the soil as required, in layers notexceeding 20cm in depth, including consolidating each deposited layer by ramming,watering, etc., and disposing of surplus excavated soil as directed, within a lead of50m, in all kinds of soil. |
| 17 | 4.1.5Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mmnominal size derived from natural sources) Please Enable Macros to View BoQ information |