| 1 | N.S. Item |
| 2 | Laying of D.I. Pipe line By Tranchless Technology. in normal soil condition but not rock/ bolder/any undergound utilities like foundation Road, Drain coming in alingment or other underground obstruction suitable for MS casing pipe of size complete for 500 mm i/d MS Pipe 10mm thick casing pipe. consisting with:- 1.Machinery on hire basis, Labour Heavy Hydraulic Crane, Jacking Machine and other necessary equipment HorizontalBoring/ Excavation. 2.Providing and Inserting of 500mm i/d M.S. casing pipe 10 mm thick(Fe-330 grade)Fabricated as per IS 3589 of 1991 from steel plates confirming to IS:-2062 including cutting, beveling, grinding and jointing with radiographically welding of pipe as per IS- 1182 and testing complete in all respect. 3.Providing and Inserting of 350mm i/d DI K9 Pipe and testing complete in all respect. 4.Providing and Fixing of MS Spacer at a distnce of 2 Mtrs apart to avoid contract of casing pipe and carrier pipes complete - For 500mm i/d MS casing pipe of size complete for 350 mm D.I. pipe 5.Excavation for receiving pit of size 6m x 2.50 m x 4 m normal excavation for laying of casing pipe and laying of sewer pipe complete to satisfaction of Engineer-in-change. 6.Both side Plugs :-Concrete block 1:1.5:3 on both ends to plug the angular space between casing and carrier pipe complete in all respects.Trench for 350mm i/d |
| 3 | Supplying, erection, testing and commissioning of raw water horizontal split casing motor pumping set having head below mentioned as per the indicated requirements of discharge in LPM andhead with suitable bhp motor as per IS marked. `1000 LPM x 12 M |
| 4 | Providing , Installation and Commissioning of 150 Wattage LED lights outdoor with Lamp Operation Mode ON, OFF Light Source High Power SMD LED, Lamp Life span of LEDs used in the Luminaire shall be 0 ) 50000 hours. @l L70 ,Color rendering index (CRI) of the LEDs used in the luminaire shall be ) 70 including Cost of all accessors wiring and other material complete in all respect. |
| 5 | Providing , Installation and Commissioning of 100 Wattage LED lights outdoor with Lamp Operation Mode ON, OFF Light Source High Power SMD LED, Lamp Life span of LEDs used in the Luminaire shall be 0 ) 50000 hours. @l L70 ,Color rendering index (CRI) of the LEDs used in the luminaire shall be ) 70 including Cost of all accessors wiring D15and other material complete in all respect. |
| 6 | Supplying erection, testing of fully automatic electric control panel board for non clog submersible set for Raw water pumping capacity 5300 LPM, 40 mtr. Head at raw water sump well as per site requirement complete in all respect. |
| 7 | Supply and erection testing commissioning of electric non clog submersible pump 5300 lpm 40 mtr. head with tee suction pipe fitting of pump ABS/AQUA/ EBARA/ KIRLOSKAR/Mand P -WILO /KSB MAKE with suitable BHP Electric Motor with accessories as described in Schedule No.II complete in all respect.. |
| 8 | Supply and erection of Horizontal spindle split casing type pumping sets minimum Four Star rating duties coupled to AC squirrel cage induction type motor with 1440 RPM 3 phase 50 Hz and accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame 1500 LPM X 12 Mtrs HEAD |
| 9 | Less Credit for Old Machinary for Raw Water pump, Credit for Clear Water Pump and Submersible Pump set (i.e. 2x1200 LPM x12 Mtr. Head x 7.50 BHP) |
| 10 | Less Credit for old brick and brick bats taking 60% bricks |
| 11 | LESS CREDIT BRICK BATS 40% |
| 12 | Less Credit of old clear water pumping machinery of 1200 lpm x 40 mtr. head ( as at site)including dismantling charges without electrical panel and valves, pipes, etc. |
| 13 | Less credit of old pumping machinery 1000 LPM X 12 M head(RAW WATER) |
| 14 | Less credit of old inlet channel RCC NP2 pipe 400 mm i/d ( as it is on site ) including , removal of pipe, excavation , dismantling of brick pillars and houdies, upto bed level, loading ,carriage, unloading all labour and machinery works included and site to got clear and leveled complete in all respect for inlet channel from Sirsa Major Distributory to to water works Gillankhera Dist. Fatehabad... |
| 15 | Less credit of old inlet channel RCC NP2 pipe 350 mm i/d ( as it is on site ) including , removal of pipe, excavation , dismantling of brick pillars and houdies, upto bed level, loading ,carriage, unloading all labour and machinery works included and site to got clear and leveled complete in all respect for inlet channel from Bodiwali Minor to to water works Kukrawali and Water works Bodiwali Dist. Fatehabad |
| 16 | Less Credit of old clear water pumping machinery of 1500 lpm x 40 mtr. head ( as at site)including dismantling charges without electrical panel and valves, pipes, etc. |
| 17 | Credit of steel..1 ( Renovation of existing structures at water supply scheme) |
| 18 | Less credit of old inlet channel RCC NP2 pipe 450 mm i/d ( as it is on site ) including , removal of pipe, excavation , dismantling of brick pillars and houdies, upto bed level, loading ,carriage, unloading all labour and machinery works included and site to got clear and leveled complete in all respect for inlet channel from OLD Mochiwali minor to water works Kukrawali and Water works Bodiwali and Manawali minor to Water works Sarwarpur to Dist. Fatehabad |
| 19 | Item Description |
| 20 | HSR Item Please Enable Macros to View BoQ information |