Name of Work:- Construction of toe wall & stone pitching to slope portion of left side of from Boat House to Intake of Upper Kolab Dam.
Sl. No.
Item Description
1
Earth work excavation in cutting hard soil including moorum, stoney earth mixed with boulders with all leads and lifts including dressing, levelling and depositing the excavated earth away from the work site with all leads and lifts including cost of all labour, T&P and cess, required for the work and etc. complete in all respect and as per the direction by the Engineer-in-charge.
2
Sand filling in foundation and plinth with all cost, conveyance, royalty, taxes with all labour charges, watering, ramming etc. complete as per the specification and direction of the Engineer-in-charge.
3
Cement concrete M-20 grade with 40mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying graded mixed in concrete mixtures including cost of all materials, machineries and labour and placing of mixed concrete with all leads, lifts, delifts upto 1.5m height above average ground level as per direction of Engineer-in-charge.
4
Rigid and smooth centering, shuttering including all cost, conveyance, taxes, royalty dismantling after specified period and removing the debris after completion of works clear off the work site etc. complete as per the direction of the Engineer-in-charge.
5
Cement concrete M-15 grade with 20mm and down grade black hard granite (crusherbroken) stone chips including hoisting and laying graded mixed in concrete mixtures including cost of all materials, machineries and labour and placing of mixed concrete with all leads, lifts, delifts upto 1.5m height above average ground level as per direction of Engineer-in-charge.
6
Rough stone dry packing in approns & revetments with hard granite stones 30 cm & above size including cost of allmaterials, labour charges, labour cess ,royality, taxes, & all T&P materials etc complete as per specification & as directed by the Engineer in charge
7
Grouting approns and revetment 23cm deep with cement concrete (1:4:8) with 2.5cm broken granite metal including cost of allmaterials, labour charges, labour cess ,royality, taxes, & all T&P materials etc complete as per specification & as directed by the Engineer in charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.