| 1 | Part - A (a) :- Construction of 11KV line using 11Mtr long 160X152mm WPB Pole with 100mm2 AAAC = 0.120Km. (From point D to E as shown in the SLD-1) and with 80mm2 AAAC= 0.2Km with installation of 11KV line DP with AB switch arrangement = 01No. (As shown inSLD -2) and erection of 11KV line pole using 11Mtr long 160X152mm WPB Pole =01No towards shifting of existing pole (At point D as shown in SLD-4).1. Cut point with 90 degree angle.WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)-DP(Total Pole Weight with Base Plate & Stiffner=334.84 KG+10.74 KG= 345.58 KG) |
| 2 | Top Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 2.3 mtr., 2no's Channel(GI) required =( 2x9.56x2.3) |
| 3 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required =(6x2.36x0.280) |
| 4 | Double Pole Belting Channel(GI) 75X40X4.8mm., 7.14KG/Mtr., each Channel(GI) length 1.66 Mtr., 4 no's Channel(GI) required=( 7.14x1.66x4) |
| 5 | 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 2.671 mtr.,4 nos Angle(GI) required = (4.5x2.671x4) |
| 6 | Danger Plate, 2 no's. |
| 7 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 8 | H.T. Stay clamp, 50x8 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 9 | (H.T. Stay set (Complete ) |
| 10 | H.T. Stay Insulator Type-C |
| 11 | 7/10 SWG Stay Wire 15kg /stay |
| 12 | (Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 13 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr.,(2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 5x2.36 |
| 14 | GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 15 | Back Clamp for anticlimbing device 25X3mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 16 | 11 KV pin insulator polymer |
| 17 | H W fitting(B&S) 70KN, 3BoIt |
| 18 | Disc insulator (B&S) 70 KN polymer |
| 19 | WEDGE CONNECTOR FOR 100 SQMM.CONDUCTOR |
| 20 | POLYCARBONATE BIRD GUARD |
| 21 | GI Nut , Bolt & Washer of different sizes (12.261 Kg each DP without AB Switch) |
| 22 | Black Paint(GIS Numbering & Zebra Stripping) |
| 23 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 24 | Civil & ServicesFixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator4) Stay Wire.5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.SCum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 25 | Concreting ratio 1:1.5:3(M-20 Grade)(500mmX500mmX1800mm) =0.45Cu.mtr(Per Pole) |
| 26 | Couping ratio 1:1.5:3(M-20 Grade) withdimension (500X500X450)= 0.1125 Cu mtr(Per Pole) |
| 27 | Provide necessary civil material forconstruction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing &design |
| 28 | 2.Cut point with 90 degree angle.WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 29 | Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 1.2 Mtr. 4 Nos. Chanel required = (4x9.56 x 1.2) |
| 30 | Fish Plate 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 16Nos. required = (16x2.36 x 0.280) |
| 31 | Straight Cross Arm 100 x 50 x 6 mm 9.56 KG per Mtr. each Channel (GI) length 0.306 Mtr. 4 Nos. Chanel required = (4x9.56 x 0.306) |
| 32 | Danger Plate 1Nos. |
| 33 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 34 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 35 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 36 | 11 KV Pin insulator Polymer. |
| 37 | H.W. Fittings (B&S) 70KN 3 bolt |
| 38 | Disc insulator (B&S) 70 KN Polymer |
| 39 | Earthing of support (Coil type) |
| 40 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 41 | WEDGE CONNECTOR FOR 100 SQMM CONDUCTOR |
| 42 | PoLYCARBONATE BIRD GUARD |
| 43 | HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair) |
| 44 | HT Stay set complete |
| 45 | HT Stay Insulator-Type C |
| 46 | 7/10 (SWG) Stay wire 15kg/Stay |
| 47 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 48 | Black paint (GIS Numbering and & Zebra Sripping) |
| 49 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 50 | Civil & ServicesFixing of complete 11KV line complete Stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & Standard |
| 51 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 52 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 53 | 3. 11 KV Pin Points With WPBWPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 54 | 11KV V Cross Arm GI (10.2 Kg Each) |
| 55 | Top bracket 100 x 50 x 6mm GI Channel (GI) (2kg each) |
| 56 | Danger Plate 1No. for each pole |
| 57 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 58 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 59 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 60 | 11 KV Pin insulator Polymer. |
| 61 | Earthing of support (Coil type) |
| 62 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 63 | G.I. nuts, Bolts & washer of different size (1.45Kg/ Pin Point) |
| 64 | 100 mmsq AAAC |
| 65 | 80 mmsq AAAC |
| 66 | Crimping type Midspan Compression Jointfor 100 sq.mm AAA conductor |
| 67 | Crimping type Midspan Compression Jointfor 80 sq.mm AAA conductor |
| 68 | Black paint (GIS Numbering and & Zebra Sripping) |
| 69 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 70 | PoLYCARBONATE BIRD GUARD |
| 71 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 72 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 73 | Installation of 25KVA, 11/0.23KV Sing/e pole moonfed S/S =01No.using 11Mtr long 160X152mm WPB Po/e fovrards shifting oF existing S/S (As shown in SLD - 5)WPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 74 | Top Channel (GI) GI 100 x 50 x 6 mm 9.56 Kg / Mtr., each chanel length (3Mtr. 2Nos. Channel (GI) required (2 x 9.56 x 3) |
| 75 | Fish Plate (GI) 50 x 6mm, 2.36kg/Mtr. each 0.280 Mtr. length 6Nos. required = (6x2.36 x 0.280) |
| 76 | Transformer mounting bracket (65 x 65 x 6mm) suitable for 16/10KVA 11/0.23 KV Transformer |
| 77 | AB Switch mounting Channel (GI) 75 x 40 x 4.8mm GI Chanel (3000mm long) 7.14Kg / Mtr., 2Nos. (Each 2 x 3.0 x 7.14 = 42.84 Kg) |
| 78 | Cantilever Support angle 50 x 50 x 6mm GI (1282 mm long) (4.5 Kg / Mtr. 2Nos.) (Each 2 x 1.282x 4.5 = 11.54Kg) |
| 79 | HG/DO Fuse mounting Channel (GI) 75 x 40 x 4.8 mm GI channel (2000mm long) 7.14Kg / Mtr., 2Nos. (Each 2 x 2.000 x 7.14 = 28.56 Kg) |
| 80 | 25x3mm GI flat for earthing, 0.59kg/mtr., (2.5 x 7 Mtr. for mesh formation, 12 Mtr. for LA and 2.5 Mtr. for raising, 11Mtr. for AB switch, 2.8Mtr. for HG Fuse, 5x2 mtr.for DTR and Nutral, (1.3 + 4.5) mtr for DTR Body 0.500 Mtr for LTDB & AB Switch operating handle, 3 Mtr. for Fenching) Each 62.6 x 0.59 =36.93 Kg). |
| 81 | LT distribution Box with MCCB, Aluminium Busbar of single bay with kit kat fuse for 25KVA S/S |
| 82 | 55mmsq All Alloy Aluminum Conductor (AAAC) covered conductor |
| 83 | 2C x 16mm2 LT XLPE Cable (Armoured) |
| 84 | AB switch (11KV 200A 3 Pole 50 Hz) |
| 85 | HG Fuse (11KV 200A 3 Pole) |
| 86 | WEDGE CONNECTOR FOR 80 SQMM CONDUCTOR |
| 87 | PoLYCARBONATE BIRD GUARD |
| 88 | Disc insulator (B&S) 70 KN Polymer |
| 89 | H.W. Fittings (B&S) 70KN 3 bolt |
| 90 | 11KV Lightning Arrestor 12KV-10KA (Station Class) |
| 91 | 11 KV Pin insulator Polymer. |
| 92 | HT Stay set complete |
| 93 | HT Stay Clamp 50x8mm flat, 3.14kg / Mtr., 0.551 Mtr. Length, 2Nos. qty required (1pair) |
| 94 | HT Stay Insulator-Type C |
| 95 | 7/10 (SWG) Stay wire 15kg/Stay |
| 96 | GI pipe earthing 40 mm 3Mtr. Long |
| 97 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 98 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 99 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 8No. = (8x 0.59 x 0.510) |
| 100 | Danger Plate 1Nos. |
| 101 | Black Clamp for danger plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No. = (1x 0.59 x 0.510) |
| 102 | Name plate |
| 103 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 104 | Black paint (GIS Numbering and & Zebra Sripping) |
| 105 | Civil & ServiceConcreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 106 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 107 | PCC ratio 1:3 :6 (M 10 Grade) for DSS Area (5x3x0.1) = 1.5 Cum (Per pole) |
| 108 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 (M-10 Grade) size (900 x 600 x 900mm) using 40mm BHG metal with all labour and material except stay set, stay wire stay insulator. |
| 109 | Construction Earthing chamber including installationof earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe40mm/50mm including welding of Flat(GI) around pipe . |
| 110 | Laying of 2 Cx 16 mm2 LT PVC Cable |
| 111 | Supply of AL Lugs suitable for 16 sq mmcable/conductor, Crimping with cable andFixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 112 | SITC and Erection of GI Fencing with Gate |
| 113 | (PART-A (c):- Consfrucfion of LT line Using 9Mtr long 300Kg PSC Pole with 4CX50 + 1CX50 + 1CX16 mm2 ABC -- 1.07Km (34Nos Span) (From poinf B to - C -- 0.12Km as shown in SLD -1 + A to B = 0.45Km as shown in SLD - 3 + A to B (Double Circuit)= 0.2Km as shown in SLD - 4 + C fo D = 0.12Km as shown in SLD - 6) and 2X35+1X25 mm2 ABC = 0.19Km (6NOs Spart) (Proposecf 25KVA DT to existing po/e = 0.07Km. as shown in SLD - 5 + A to B = 0.12Km (as shown in Si.D - 6) with erection of LT pole using 9Mtr long 300Kg PSC po/e = Of/\/o (as shown in SLD -5). (LT Line with PSC Pole)9Mtr. long PSC Pole 300 Kg. |
| 114 | LT Stay set complete |
| 115 | 7/12 (SWG) G.I. Stay wire-Grade-2 |
| 116 | LT Stay Clamp (1.4 kg / pair) |
| 117 | LT Stay Insulator |
| 118 | Pole clamp for Eye hook for (XLPE erial bunched cable) |
| 119 | Eye hook for (XLPE erial bunched cable 25-70mmsq) |
| 120 | Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq) |
| 121 | Suspension clamp with EYE hook for ABC |
| 122 | 4C x50mmsq + 1C x50mmsq + 1C x 16mmsq (Street light) (LT AB Cable) |
| 123 | 2C x35mmsq + 1C x25mmsq (LT AB Cable) |
| 124 | Insulated piercing connector, Type B main 50 to 150mmsq and Tap 50 to 150sqmm. |
| 125 | Earthing of support (Coil type) |
| 126 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 127 | Danger Plate LT |
| 128 | Black Clamp for danger board plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No's. = (1x 0.59 x 0.510) |
| 129 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 130 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 131 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 132 | Black paint (GIS Numbering and & Zebra Sripping) |
| 133 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 134 | Civil & ServiceFixing of LT complete stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG Metal with all labour and material (Excavation of earth will be done of size 500 x 500 x 1500mm.) |
| 135 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1500mm) =0.375 Cu. Mtr. |
| 136 | (PART-A (d):- Construction of Double Circuit LT line Using 11Mtr long WPB Pole with 4CX501CX501CX16 mm2 ABC 400m(with Double Ckt arrangement) (From point A to-B-02KmX2=0.40Km Km as shown in SLD-4 (LT Line with WPS Pole for double ckt arrangement1. LT AB Cable lineWPB (GI) Pole 160 x 152 (11Mtr. long 30.44KG/Mtr.)(Total Pole weight with base plate and shiffner = 334.84 Kg + 10.74 Kg = 345.58 Kg. |
| 137 | LT Stay set complete |
| 138 | 7/12 (SWG) G.I. Stay wire-Grade-2 |
| 139 | LT Stay Clamp (1.4 kg / pair) |
| 140 | LT Stay Insulator |
| 141 | Pole clamp for Eye hook for (XLPE erial bunched cable) |
| 142 | Eye hook for (XLPE erial bunched cable 25-70mmsq) |
| 143 | Dead end clamp for suitable for messenger XLPE Aerial bunched cable (25-70mmsq) |
| 144 | Suspension clamp with EYE hook for ABC |
| 145 | 4C x50mmsq + 1C x50mmsq + 1C x 16mmsq (Street light) (LT AB Cable) |
| 146 | Insulated piercing connector, Type B main 50 to 150mmsq and Tap 50 to 150sqmm. |
| 147 | Earthing of support (Coil type) |
| 148 | No.8 G.I. wire(dia 4.6mm) 0.131 KG/Mtr. -2Mtr. for connecting pole with coil earthing. |
| 149 | Danger Plate LT |
| 150 | Black Clamp for danger board plate 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 1No's. = (1x 0.59 x 0.510) |
| 151 | G.I. Barbed wire / Anticlimbing device (3Kg /support) |
| 152 | Black Clamp for anticlimbing device 25x 3 mm flat 0.59Kg / Mtr. Flat of 0.510 Mtr. length 4No. = (4x 0.59 x 0.510) |
| 153 | G.I. nuts, Bolts & washer of different size (3.55Kg each Cut pole) |
| 154 | Black paint (GIS Numbering and & Zebra Sripping) |
| 155 | Yellow Colour paint (GIS Numbering and & Zebra Sripping) for Background |
| 156 | Civil & ServiceFixing of complete 11KV line complete Stay set includes, 1. turn buckle Assembly, 2. Stay Rod & Stay plate, 3. Stay insulator, 4. Stay Wire, 5. Stay clamps with Nuts and bolts BA will do the excvation including excavation, suppy of 0.5 Cum Cement concrete foundaton 1:2:4 size (500mm x500mm x 800mm) using 20mm BHG metal with all labour and material as per TPCODL drawing & Standard |
| 157 | Concreting ratio 1:1.5 : 3 (500mm x 500mm x 1800mm) =0.45 Cu. Mtr. |
| 158 | Coupping ratio 1:1.5 : 3 with dimension (500mm x 500mm x 450mm) =01125 Cu. Mtr. |
| 159 | (PART-A(e):- Line Protection Guarding for Road Crossing Guarding Channel 75x40x4.8 mm, 7.14 KG/Mtr., each channel length 3.5 mtr., 4 no's channel required =( 4x7.14x3.5) ( For Double Pole) |
| 160 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 161 | No-8 GI wire (0.131 kg/mtr.) for lacing |
| 162 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 163 | Gi Pipe Earthing 40mm. 3 Mtr. Long |
| 164 | 50x6mm GI Flat for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36 |
| 165 | Civil & ServiceConstruction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earthresistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe . |
| 166 | Part-A (f): Dismantalling materialsDismantling of 9/8 Mtr. PCC/Joist Pole |
| 167 | Dismantling/Removal of V Cross arm from pole |
| 168 | Dismantling of 11kV Pin Insulator with Pin |
| 169 | Dismantling of 11kV Disc Insulator with Hardware |
| 170 | Dismantling/Removal of MS Channel. from Double Pole Structure/pole |
| 171 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 16KVA including removal of HT/LT leads, earth connections and unloading by crane if required |
| 172 | Dismantling of existing 11/0.4kV, 33/0.4KV, Three Phase Distribution Transformer 25KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 173 | Re-Installation, Testing and Commissioning of 11/0.4kV, 25kVA Single phase/3-Phase Distribution Transformer on existing structure as per TP Central Orissa Distribution Co. Ltd. specification including loading, unloading, shifting/transportation from site/tent upto 15KM, Testing of Transformer at Site. Scope of work includes jumpering/connection at HT and LT side & Earthing Connections. |
| 174 | Dismantling of ACSR/AAAC 34/55mm2 from overhead line |
| 175 | Dismantling of varous size of LT AB Cable |
| 176 | Dismantling of 11 kV/33KV GO/AB Switch/Isolator/DD fuse/fuse set |
| 177 | Dismantling of Lightening Arrester(LA Please Enable Macros to View BoQ information |