| 1 | Dismantling brick or stone masonry in lime or cement mortar above 3m. height incl.stacking the useful materials for reuse & removing the debris within 50m. Lead etc. complete.(First Floor Roof Beam ) |
| 2 | Second Floor Roof Beam |
| 3 | Mumty Room |
| 4 | Dismantling and removing R.C.C.column,beam slab,staircase,landing,lintel incl.stacking the useful materials for reuse &removing the debris within 50m. lead etc. complete.(Ground Floor Roof Beam) |
| 5 | First Floor Roof Beam |
| 6 | Second Floor Roof Beam |
| 7 | Earth Work in exavation of foundation in hard soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect |
| 8 | Supplying filling in foundation and plinth with sand including watering and ramming,poking & compacting and dressed and levelled to proper gradient including cost, conveyance, royalities, taxes of materials and cost of all labour,labour cess,T&P etc required for the workcomplete as directed by the Engineer-in-charge. |
| 9 | Cement Concrete (1:2:4) using 12mm size hard granite C.B. chips approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. |
| 10 | R.C.C work of M-25 grade having a minimum compressive strength in work test of 250 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordence with IS 456 IS516 using 20 mm down graded size black hard granite stone chips of approved quality from approved quarry including hoisting lowering and laying concrete and compting by using vibrates watering and curing ,finishing the exposed surface smooth,providing grooves and beads where necessary in all heights complete including cost , conveyance, royalityies, taxes of all materials, cost of all labour, labour cess and all T&P etc required for the work complete in all respect but excluding centering ,shuttering and reinforecment as per the direction of the Engineer-in-charge. Raft |
| 11 | Ground Floor Column C1 |
| 12 | First Floor Column C1 |
| 13 | Second Floor Column C1 |
| 14 | Mumty Room Floor Column C1 |
| 15 | Grade Beam B3 |
| 16 | Ground Floor Beam B1 |
| 17 | Ground Floor Beam B2 |
| 18 | First Floor Beam B1 |
| 19 | First Floor Beam B2 |
| 20 | Second Floor Beam B1 |
| 21 | Second Floor Beam B2 |
| 22 | Mumty Room Beam B2 |
| 23 | Mumty Room Slab |
| 24 | Supplying ,Straightening,cutting,bending bent up or coiled rods,including cranking, hooking, welding or jointing the MS rods or tor confirming to IS431(Plain) and 1785(Tor) steel and binding,laying the grills,hoisting,lowering and placing in proper position required for RCC works including cost,conveyance and taxes of specified rods and binding wire of 18 20 gauge confirming to IS 280(galvanised minimum 1mm) and cost of all labour,labour cess with allT&P requird for the work etc complete as directed by the Engineer-in-Charge(Ground Floor R.C.C Qty ) |
| 25 | First Floor R.C.C Qty |
| 26 | Second Floor R.C.C Qty |
| 27 | Mumty Room R.C.C Qty |
| 28 | Rigid & smooth centering & shuttering for R.C.C work etc. complete.(R.C.C Raft ) |
| 29 | Column C1 |
| 30 | Ground Floor |
| 31 | First Floor |
| 32 | Second Floor |
| 33 | Mumty Room |
| 34 | Beam (Ground Floor ) |
| 35 | First Floor |
| 36 | Second Floor |
| 37 | Mumty Room |
| 38 | Roof Slab (Slab ) |
| 39 | Brick work cement moratr (1:6)with Flyash brick 25cm x 12cm x 8cm having crushing strength not less than 75kg / cm2 with dimentional tolerance +2% in cement mortar including all cost, carriage & royalty of materials etc. complete as per direction of Engineer-in-Charge.(Foundation ) |
| 40 | Ground Floor |
| 41 | First Floor |
| 42 | First Floor Balcony Portion |
| 43 | First Floor Balcony Portion |
| 44 | Second Floor |
| 45 | Second Floor Balcony Portion |
| 46 | Second Floor Balcony Portion |
| 47 | Mumty Room |
| 48 | Providing 16mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge.(External Wall Sub Structure) |
| 49 | Ground Floor |
| 50 | First Floor |
| 51 | First Floor Balcony Portion |
| 52 | First Floor Balcony Portion |
| 53 | Second Floor |
| 54 | Second Floor Balcony Portion |
| 55 | Second Floor Balcony Portion |
| 56 | Mumty Room |
| 57 | Providing 12mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge.(Internal Wall Sub Structure) |
| 58 | Ground Floor |
| 59 | First Floor |
| 60 | First Floor Balcony Portion |
| 61 | First Floor Balcony Portion |
| 62 | Second Floor |
| 63 | Second Floor Balcony Portion |
| 64 | Second Floor Balcony Portion |
| 65 | Mumty Room |
| 66 | Providing 6mm thick C.P. in C.M.(1:4) to R.C.C surface including close deep chipping & slurry treatment with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in- charge. |
| 67 | 2.5cm.th.D.P.C. with C.C (1:2:4) using 12mm.size BHGCB chips etc, complete. |
| 68 | Finishing walls with water proofing cement paint of approved shade on new work two coats over cement primer to give an even shade including cost of cement paint.(Ground Floor ) |
| 69 | First Floor Inside Side |
| 70 | First Floor Outer Side |
| 71 | First Floor Balcony Portion |
| 72 | First Floor Balcony Portion |
| 73 | First Floor Inner Side |
| 74 | First Floor Balcony Portion |
| 75 | First Floor Balcony Portion |
| 76 | Second Floor Outer Side |
| 77 | Second Floor Balcony Portion |
| 78 | Second Floor Balcony Portion |
| 79 | Second Floor Inner Side |
| 80 | Second Floor Balcony Portion |
| 81 | Second Floor Balcony Portion |
| 82 | Mumty Room (Inner Side) |
| 83 | Mumty Room (Outer Side) |
| 84 | Priming one coat with any approved wall primer including all labour etc complete . (Ground Floor ) |
| 85 | First Floor Outer Side |
| 86 | First Floor Balcony Portion |
| 87 | First Floor Balcony Portion |
| 88 | First Floor Inner Side |
| 89 | First Floor Balcony Portion |
| 90 | First Floor Balcony Portion |
| 91 | Second Floor Outer Side |
| 92 | Second Floor Balcony Portion |
| 93 | Second Floor Balcony Portion |
| 94 | Second Floor Inner Side |
| 95 | Second Floor Balcony Portion |
| 96 | Second Floor Balcony Portion |
| 97 | Mumty Room (Inner Side) |
| 98 | Mumty Room (Outer Side) |
| 99 | Providing two coats of plastic emulsion paint of approved shade on wall surface including cost, conveyance of materials labour, T&P etc. complete as per direction of the Engineer-in-charge.(Ground Floor ) |
| 100 | First Floor Outer Side |
| 101 | First Floor Balcony Portion |
| 102 | First Floor Balcony Portion |
| 103 | First Floor Inner Side |
| 104 | First Floor Balcony Portion |
| 105 | First Floor Balcony Portion |
| 106 | Second Floor Outer Side |
| 107 | Second Floor Balcony Portion |
| 108 | Second Floor Balcony Portion |
| 109 | Second Floor Inner Side |
| 110 | Second Floor Balcony Portion |
| 111 | Second Floor Balcony Portion |
| 112 | Mumty Room (Inner Side) |
| 113 | Mumty Room (Outer Side) |
| 114 | 6.0 sq mm ISI marked FR PVCinsulated (unseathed) singlecore copper conductor |
| 115 | S.P. 15/1 6 amps, one way modular switch, ISI marked |
| 116 | S.P. 5 /6 amps, two way modular switch, ISI marked |
| 117 | 3 pin 5 / 6 amps, modular socket outlet, ISI marked |
| 118 | 200mm x 300mm x 100mm deep metal box 18 SWG |
| 119 | Earthwork in all kinds of soil etc complete in all respect. (Quantity has taken on Lumpsum Basis) |
| 120 | 25 mmx 5 mm G.l. strip (1.0 kg / Mtr) |
| 121 | 25 mmx 5 mm Copper tape (1.15 Kg / Mtr) |
| 122 | 6 SWG G.l. wire |
| 123 | 8 SWG Copper wire (4.0 mm dia) |
| 124 | Lightning finial, 25 mm dia x 300 mm long copper |
| 125 | Charcoal |
| 126 | Supply And Installation of Passenger Lift 3nos person 200KG Capcity |
| 127 | Stagging and Scafolding work |
| 128 | Display board & photograph |
| 129 | Sub Total |
| 130 | SGST 9% of Sub-Total |
| 131 | CGST 9% of Sub-Total Please Enable Macros to View BoQ information |