| 1 | Earthwork in excavation of foundation trenches or drains in all sorts of soils including removing spreading or stacking the spoils within a lead of 75 m as directed including trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water etc. all complete. (a) Depth of excavation not exceeding 1.5 m. |
| 2 | Earthwork in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm including watering and ramming etc. layer by layer complete. (a) With earth obtained from excavation of foundation. |
| 3 | Removal of rubbish,earth etc from the working site and disposal of the same beyond the compound in conforming with the Muncipality/Corporation Rules for such disposal,loading into trucks and cleaning the site in all respect as per direction of Enginner in Charge. |
| 4 | Single layer brick flat soling of picked bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. |
| 5 | Cement Concrete with graded stone ballast (30 mm size) excluding shutteirng. (B) In ground floor (with N.B. Variety Stone metal) (a) (1:3:6) proporaton. |
| 6 | Hire and Labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stoutprops and thick hard wood planks of approved thickness with required bracing for concrete slab, beams and columns,lintels curved or straight including fitting & fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge. |
| 7 | M.S or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I Flats and bars of windows, ralling etc. fitted and fixed with necessary screws and lugs in ground floor. (ii) Grill weighing above 16 Kg./sq.mtr and above. |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar, including rounding off corners or chamfering corners as directed and recking out joints or roughening of concrete surface. With (4:1) cement morter 20 mm thick plaster. |
| 9 | Artificial stone in floor, dado, staircase etc with cement concrete 1:2:4 with stone chips, laid in panels as directed with topping made of ordinary or white cement and marble dust in proportion 1:2 including smooth finishing and round off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. 3mm th topping (using grey cement) 35mm thick |
| 10 | Priming one coat to steel or metal surface, with ready mixed primer of approved quality, including smoothening surface by sand papering etc. |
| 11 | Painting (any shade as directed) with ready mixed oil bound paint or super gloss synthetic enamel (hi-gloss) paint of approved make and brand (except red-lead paint, Aluminium paint and black Japan) including smoothening surface by sand papering etc. (b) Steel or other metal surface (iv) Two coats (with any shade except white) Please Enable Macros to View BoQ information |