| 1 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. (a) By manual means : (ii) From 50 mm to 100 mm thick. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 18.02 Page No.331) |
| 2 | Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.)(Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.02)) |
| 3 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Night Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 ) |
| 4 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 ) |
| 5 | Liquid Seal Coat (Type A) Providing and laying Liquid Seal Coat (Type A) with approved quality stone chips and bitumen binder on thoroughly cleaned black top surface, spreading screened & cleaned stone aggregates (100 % passing through 11.2 mm sieve and retained on 2.36 mm sieve) uniformly @ 0.09 m3 of dry aggregate per 10 m2 of area using suitable means, brushing the chips, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and stone chips, cost of heating the binder and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) With Cationic Bitumen Emulsion (@ 15.00 kg / 10 sqm.)((Ref. - Item No. - 5.13(A)(II), P-258 of P.W(R)D Schedule 2018, Format-B, P-220 of P.W(R)D Schedule 2018, TABLE No. T-1, Item no.-4/A, P-230 of P.W(R)D Schedule 2018, TABLE III-2, ROW-16, P-226 of P.W(R)D Schedule 2018, Ref-TABLE No. T-1, Item no.-3/A, P-230 of P.W(R)D Schedule 2018, 1.03 A (C), P-227 of P.W(R)D Schedule 2018, TABLE No. T-1, Item no.-3/A, P-230 of P.W(R)D Schedule 2018)) |
| 6 | Sub Total |
| 7 | GST 18% |
| 8 | CESS 1% Please Enable Macros to View BoQ information |