| 1 | Pumping arrangement at WTPLocation : - WTP , BalligudaSupply with installation , testing and commissioning of Centrifugal Pumpsets of reputed make and compatible to VFD and AMF with 50% Stand bye arrangements ( 2W + 1S ) as per specification having discharge (Q) 30lps, Head (H)- 100mtr. as per direction of Engineer in charge. |
| 2 | Foundation base for Centrifugal pumpsetSupplying all labour, T&P and earth work in excavation in all kinds of soil as per direction of Engineer in charge. |
| 3 | Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed as per direction of Engineer in charge. |
| 4 | Supplying all labour, T&P and providing Cement Concrete (1:3:6) using 4cm HBG crusher metal including watering curing,as per direction of Engineer in charge. |
| 5 | Supplying all labour, materials, T&P and providing Cement concrete (1:1½ :3) with crusher broken hard granite chips of 12mm size as per direction of Engineer in charge. |
| 6 | Supplying all materials, labour, T&P and providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and laying the grill and position as per direction of Engineer in charge. |
| 7 | Anchoring of foundation bolt( including cost ) with coupling of shaft , alignment with commissioning and testing of Centrifugal pumpsets as per direction of Engineer in charge. |
| 8 | Supplying all labour and T&P for providing and laying MS pipe and specials confirming to IS 3589/99 of quality grade FE 410/ GI Pipe (Medium) confirming to specification of following nominal dia and including transportation of pipes and fitting to site etc all complete as per the direction of E.I.C.(a) 150mm dia M.S.Pipe |
| 9 | 150mm dia M.S. Flange.(12mm thick) |
| 10 | 150mm. X 90° MS flanged bend |
| 11 | 300mm. X 150 dia.MS flanged Tee |
| 12 | 300mm. X 150 dia.MS flanged reducer |
| 13 | Supplying all labour and T&P for cutting of following dia MS pipe of following thick in treanches by gas cutter set of pocket etc all complete as per direction of Engineer in charge. |
| 14 | Welding with two welding beads/pass, conforming to IS:816-1998 (Fillet weld) to MS pipes and fittings at site as per direction of Engineer in charge. |
| 15 | AUTOMATIONSupply with installation , testing and commissioning of electric valve with Actuator for non rising spindle type Sluice Valve of reputed make as per direction of Engineer in charge. (a) 150mm dia (PN1.6) |
| 16 | Supply of Pressure Gauge to be installed delivery main Range up to 10 kg/cm2, Type-Sensor, Power Supply-24 DC, Out put-4 to 20mA, Make-E & H/ABB/VEGA.with SS 316 grade sensor niddle valve with bypass tube as per direction of Engineer in charge. |
| 17 | Provision for following dia bulk eletromagnetic flow meter with - dia cast AL, cable entry - M20 X 1.5, Power supply - 24 DC, output 1 - 4 to 20 MA, output 2 - None, Alaram output - none, communication output 1 - GPRS ( 2 way communication), Process connection - flanged, MOC Flange rating - ANSI 150, MOC flow, Tube - SS304, MOC Electrode - SS316L, @ Velocity 0.5 to 6 m/s. Should have facility of communication through Android application. The bidder should provide documents like operational manual & device application and all the credentials parameters.) for approval before procurement of device so the application should be expandable in future wheneve required. including cost of materials, all labours, T&P etc. all complete as per the direction of EIC. ( E & H, Crowen Marshal, Singer, Immersion, Honney weell, ENDRESS & HAUSER etc.) (a) 250mm at WTP exit |
| 18 | 200mm. At ESR Zone 1 |
| 19 | 150mm. At ESR Zone 2 , 3, 4 |
| 20 | Supply with fitting and fixing of D.I. Mechanical dismentaling joint for use to main uninterrupted water supply in the pipeline in case eof rpair of Flow meter as per specification and direction of Enginer - in - charge (a) 250mm at WTP exit |
| 21 | 200mm. At ESR Zone 1 |
| 22 | 150mm. At ESR Zone 2 , 3, 4 |
| 23 | Supply with installation , testing and commissioning of PLC Panel for Clear water as per direction of Engineer in charge. |
| 24 | Supply with installation , testing and commissioning of Variable frequency Device ( VFD ) at out let of Pumpsets of 90.00KW capacity. |
| 25 | Supply with installation , testing and commissioning of VFD Panel suitable to Pump sets of 90.00 KW capacity as per direction of Engineer in charge. |
| 26 | Supply with installation , testing and commissioning of Pressure Transmitter with technical parameter within 100mtr. Radius from PLC as per direction of Engineer in charge. |
| 27 | Supply with installation with testing and commissioning of Pilot altitude contral valve for ESR as per direction of Engineer in charge. (a) 200mm. At ESR Zone 1 |
| 28 | 150mm. At ESR Zone 2 , 3, 4 |
| 29 | External Powe supply , Internal wiring of motor line and light point with Power Backup arrangementsWork - Materials for 11KV DP with AB switch.(a) 9 mtr long 300 kg PSC pole |
| 30 | BASE PLATE FOR PSC POLE |
| 31 | Top Channel 100X50X5mm, 9.56KG/Mtr., ea |
| 32 | Double Pole Belting Channel 75X40X 4.8mm |
| 33 | 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., |
| 34 | Back Clamp A for Belting angle for PSC P |
| 35 | Lightning Arrester(12KV,10KA)Station CI |
| 36 | AB Switch(11KV,400A,3PoIe,50 HZ) |
| 37 | Fish Plate 50X8 mm.,each0.280 mtr. Leng |
| 38 | Danger Plate |
| 39 | Back Clamp for danger Plate 25X3 mm. fla |
| 40 | GI barbed wire anticlimbing device |
| 41 | Back Clamp for Barbed wire anticlimbing |
| 42 | 11kV,5kN pin insulator polymer |
| 43 | H W fitting(B&S) 70KN,3 Bolt |
| 44 | Disc insulator (B&S) 70 KN |
| 45 | Earthing of Support ( CoilType ) |
| 46 | No-8 GI wire (Dia 4.6mm)0.131 KG/ Mtr. |
| 47 | PG clamp for 100 sqmm AAAC |
| 48 | GI Nut , Bolt & Washer of different size |
| 49 | H.T. Stay clamp |
| 50 | H.T 11kV Stay set (Complete) |
| 51 | H.T Stay Insulator |
| 52 | 7/10 SWG Stay Wire |
| 53 | 40mm nominal bore GI pipe (medium gauge) |
| 54 | 50x6 mm GI flat |
| 55 | Black Paint |
| 56 | Yellow Colour Paint for Background |
| 57 | Sercives - Materials for 11KV DP with AB Switch(a) Concreting ratio 1:1.5:3 (500mmX500mmX15 |
| 58 | Couping ratio 1:1.5:3 (500X500X450)= 0.1 |
| 59 | Stay concreting in ratio 1:2:4 |
| 60 | Construction of Earthing chamber, excava |
| 61 | Work - Materials for 11KV Pin point with PSC Pole.(i) Conductor 100 Sq.mm. |
| 62 | SUNDRIES(BIND WIRE,TREE TRIM ETC) |
| 63 | Service - Materials for 11KV Pin point with PSC Pole.(a) Survey of incremental/delta network and |
| 64 | Work - Materials for 11KVA, 11/0.433KV (AL).(a) 100 KVA,11/0.43KV(AI)Transformer |
| 65 | 9 mtr long 300 kg PSC pole |
| 66 | BASE PLATE FOR PSC POLE |
| 67 | Gl Channel 100X50X5mm,9.56 Kg/mtr. |
| 68 | GI Channel 75X40X4.5mm,7.14 Kg/mtr. |
| 69 | GlAngle 50X50X6mm, 4.5 Kg/mtr. |
| 70 | Fish Plate 50X8 mm.,each0.280 mtr. Leng |
| 71 | Back Clamp for LTDB of length 0.801 mtr |
| 72 | Danger Plate |
| 73 | Back Clamp for danger Plate 25X3 mm. fla |
| 74 | GI barbed wire anticlimbing device |
| 75 | Back Clamp for Barbed wire anticlimbing |
| 76 | Lightning Arrester (9kV,10kA) DH Class |
| 77 | AB Switch (11 KV,200A,3pole,50 Hz) |
| 78 | HG Fuse(11KV 200A 3Pole 50Hz) with PI |
| 79 | LT Distribution Box with MCCB for 100KVA |
| 80 | 11kV,5kN pin insulator polymer |
| 81 | Earthing of Support ( Coil Type ) |
| 82 | No-8 GI wire (Dia 4.6mm)0.131 KG/ Mtr. |
| 83 | H.T Stay clamp |
| 84 | H.T 11kV Stay set (Complete) |
| 85 | H.T Stay Insulator |
| 86 | 7/10 SWG Stay Wire |
| 87 | 1.1kV AI 1CX150 Sq.mmUn-armoured Cable |
| 88 | Gland for 1.1kV AI 1CX150 Sq.mm |
| 89 | Lug AL Crimping 150 Sqmm XLPE Single hol |
| 90 | H/W FIT 11KV (T&C) 45KN |
| 91 | DISC INSULATOR 11KV POLYMER B&S 45 KN |
| 92 | CLAMP PG CONDUCTOR RABBIT ACSR 55 SQMM |
| 93 | CONDUCTOR 55 SQMM ACSR RABBIT PVC INSUL |
| 94 | GI Nut , Bolt & Washer of different size |
| 95 | 40mm nominal bore GI pipe (medium gauge) |
| 96 | 25x6mm GI Flat for earthing, 2.36kg/mtr. |
| 97 | Black Paint |
| 98 | Yellow Colour Paint for Background |
| 99 | SUNDRIES(BIND WIRE,TREE TRIM ETC) |
| 100 | Service - Materials for 11KV Pin point with PSC Pole.(i) Concreting ratio 1:1.5:3 (500mmX500mmX22 |
| 101 | Couping ratio 1:1.5:3 (500x500x450) = 0.10 |
| 102 | Stay concreting in ratio 1:2:4 |
| 103 | Earth chamber, pipe install & Bentonite |
| 104 | Constr of TRF Plinth |
| 105 | Brick boundary wall fencing 3MX3M. |
| 106 | Survey and digitization of New DSS and i |
| 107 | Work - Materials for LT metering PART & associ.(a) METER SMART 3P4W LTCT 200/5A |
| 108 | BOX TP F/LTCT SMART METER 200/5A W/CMP C |
| 109 | GI Nut , Bolt & Washer of different size |
| 110 | SEAL METER POLYCARBONATE GREEN COLOUR |
| 111 | Sundries ( Saddle, M-Seal, Tapes} |
| 112 | Work - Materials for LT metering consumer PART.(i) 3.5 Cx 50 mm2 LT PVCCable(un armoured) |
| 113 | FUSE KITKAT 200 AMP |
| 114 | GI Nut , Bolt & Washer of different size |
| 115 | Flat 25X4mm 3 Pcs of size |
| 116 | No. 8 ( SWG ) GI wire |
| 117 | GI Service ConnectionBracket |
| 118 | Sundries ( Saddle, M-Seal, |
| 119 | Work - Materials for 11KV existing tapping P.DISC INSULATOR 11KV POLYMER B&S 45 KN |
| 120 | Hard Ware Fitting (B& S) 45 KN |
| 121 | PG clamp for 55 sqmm AAAC |
| 122 | 11 KV Pin insulator polymer |
| 123 | HT Stay Set Complete |
| 124 | 11 KV Stay insulator |
| 125 | HT Stay Clamp(1.9 Kg/Pair |
| 126 | 7/10 SWG Stay Wire |
| 127 | GI Nuts &BoIts of Assortedsize |
| 128 | 100x50x5 mm channel for straight Cross a |
| 129 | SUNDRIES(Bind wire,Tree Trim etc) |
| 130 | Service - Materials for 11KV existing tapping P.(a) Stay concreting in ratio 1:2:4 |
| 131 | Work - Materials for 11KV four pole.(a) WPB (GI) Pole 160x152(11Mtr. Long, 30.4 |
| 132 | Top Channel 100X50X5mm, 9.56KG/Mtr., ea |
| 133 | Double Pole Belting Channel 75X40X 4.8mm |
| 134 | 50x50x6mm.GI Bracing Angie, 4.5Kg./mtr., |
| 135 | Fish Plate 50X8 mm.,each0.280 mtr. Leng |
| 136 | Danger Plate |
| 137 | Back Clamp for danger Plate 25X3 mm. fla |
| 138 | GI barbed wire anticlimbing device |
| 139 | Back Clamp for Barbed wirs anticIimbÏ^8 |
| 140 | 11kV,5kN pin insulator polymer |
| 141 | H W fitting(B&S) 45KN,3 Bolt |
| 142 | Disc insulator (B&S) 45 KN polymer |
| 143 | Earthing of Support ( Coil Type ) |
| 144 | No-8 GI wire (Dia 4.6mm)0.131 KG/ Mtr. |
| 145 | PG clamp for 55 sqmm AAAC |
| 146 | GI Nut , Bolt & Washer of different size |
| 147 | H.T. Stay clamp |
| 148 | H.T 11kV Stay set (Complete) |
| 149 | H.T Stay Insulator |
| 150 | 7/10 SWG Stay Wire |
| 151 | Conductor 55 Sq.mm. AAA |
| 152 | 40mm nominal bore GI pipe (medium gauge) |
| 153 | 50x6 mm GI flat |
| 154 | Black Paint |
| 155 | Yellow Colour Paint for Background |
| 156 | Materials for 11KV four pole.(a) Concreting ratio 1:1.5:3 (500mmX500mmX18 |
| 157 | Couping ratio 1:1.5:3 (500X500X450)= 0.1 |
| 158 | Stay concreting in ratio 1:2:4 |
| 159 | Const. Earth Chamber, Pipe instalI,Bento |
| 160 | INTERNAL MOTOR LINE AND LIGHT POINT WIRING(i) At Intake well -MOTOR LINE WIRING(A)Supplying all materials labour , T & P for fitting and fixing the following electrical items for three phase motor line and single phase light point wiring of sunken pump chamber - 2nos. including cutting grooves and holes and making good to the damages with testing of the system as per specification and direction of Engineer - in - charge(a)Kitkat 300Amp |
| 161 | 315Amp Master Switch gear |
| 162 | 200Amp Switch gear -415V TP |
| 163 | 200Amp Busbar 4way |
| 164 | 16sq.mm. 4core Armoured copper cable |
| 165 | Labour charges for socketing , soldering , tying the cable connection including trial run and testing |
| 166 | EARTHING(a) Provision of earthing in Pumphouses for protection against lightening and thunderstorm attack |
| 167 | POWER BACK UP WITH INTERNAL WIRING(A) Supplying & Installation of DG set along with AMF panels, Acoustis enclosure, supply of alll erection & Commissioning spares, special tools and tackles (as required), instrumentation, all auxiliaries, Exhaust system & silencer, fuel tank, fuel piping and construction of RCC Foundation , DG set sheet shed with pipes , Chemical earthing -4nos & Aluminium Power cable of required length as per DG KVA Rating & type and control cable for AMF DG set of required length. This includes Transportation to the site , Trial run with required quantity of diesel, commissioning .Changeover and any other instructions as per direction of the Engineer in charge. DG for Pumpsets at WTP for 120 HP load(i)200KVA with AMF Control panel of reputed manufactures |
| 168 | Minor repair of centrifugal/Submersible pump sets at Intake, WTP & ESR , (including 100% standby) for preventive maintenance of greasing, change of gland packing, Bush, tightening of nuts and bolts and Suppling the manpower for DG operation, maintenance of Log book of DG operation period, regular greasing, checking the bush and all minor repair works as per the instruction of Engineer-in-Charge Please Enable Macros to View BoQ information |